My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-031
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2017 3:03:18 PM
Creation date
9/30/2015 8:11:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/24/2006
Control Number
2006-031
Agenda Item Number
11.I.8.
Entity Name
East Coast Railway, LLC
Subject
license agreement for public road crossing
Area
Milepost 228+118' public road crossing
Supplemental fields
SmeadsoftID
4464
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
year preceding the applicable anniversary date of this Agreement by ninety (90) days. No <br />adjustment will be made for decreases in the CPI. <br />4. The provisions and stipulations of this Agreement are a part of the consideration of the <br />licensing of the CROSSING SITE, and in the event the COUNTY shall fail to comply with any <br />of the covenants and conditions, then, at the option of the RAILWAY, this Agreement shall be <br />terminated with full legal rights and remedies retained by the RAILWAY, including but not <br />limited to the right to reenter, repossess, and remove the crossing if it shall elect to do so. <br />5. The COUNTY shall grant forthwith to the RAILWAY necessary permits for the <br />installation, construction, erection, repair and maintenance of any of the RAILWAY -owned or <br />maintained facilities described in this Agreement. If the COUNTY fails to promptly grant the <br />RAILWAY necessary permits, COUNTY shall bear all additional expense incurred by the <br />RAILWAY attributable to such failure, including costs due to slow ordering of trains. COUNTY <br />shall promptly pay such amounts upon billing by the RAILWAY. <br />6. Unless otherwise specified, the cost of installation, construction, maintenance and <br />replacement of all facilities at the CROSSING SITE, including but not limited to the crossing <br />structure and railroad and highway devices, whether performed by the COUNTY or RAILWAY, <br />shall be the sole responsibility of the COUNTY. <br />7. The RAILWAY shall install the warning devices, including the fixed signs, flashing <br />lights, bells and gates (collectively the "WARNING DEVICES"), at the CROSSING SITE at the <br />sole cost of the COUNTY; provided, however, that should the parties enter into a Railroad <br />Reimbursement Agreement, Grade Crossing And Traffic Control Devices, or like agreement <br />with the Florida Department of Transportation for the installation of the WAR\ING DEVICES <br />at the CROSSING SITE, thensuch agreement shall control for all purposes of the installation <br />XFrm0499 <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.