My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-158
CBCC
>
Official Documents
>
2000's
>
2004
>
2004-158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 12:55:23 PM
Creation date
9/30/2015 8:23:40 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/06/2004
Control Number
2004-158
Agenda Item Number
11.I.2
Entity Name
Florida East Coast Railway,LLC
Subject
License Agreement for Railway Crossing
Area
Old Dixie Hwy. south of Sebastian
Archived Roll/Disk#
3210
Supplemental fields
SmeadsoftID
4710
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> The status of the COUNTY is that of a licensee and not lessee, granting the COUNTY the right <br /> to use the CROSSING SITE as specified herein. <br /> In consideration of the granting of this Agreement by the RAILWAY , the COUNTY <br /> covenants and agrees with the RAILWAY as follows : <br /> 1 . The CROSSING SITE shall be used for public at- grade road crossing purposes only <br /> and no utility, including telecommunications facilities, pipes, wires, cables ; or other line or <br /> structure shall be placed in, on or over the CROSSING SITE without the previous consent in <br /> writing of the RAILWAY . COUNTY further agrees that it will at all times keep the CROSSING <br /> SITE, together with the additional portions of the RAILWAY ' S right-of-way within 325 feet of <br /> the northerly and southerly limits or boundaries of the CROSSING SITE clear of any vegetation <br /> or other growth greater than two (2) feet in height on each side of the tracks at the sole expense <br /> of the COUNTY and without cost to RAILWAY or lien upon RAILWAY ' S property. <br /> 2 . This Agreement is for an initial term of one ( 1 ) year and shall continue in effect <br /> thereafter from year to year, subject to termination by the RAILWAY or COUNTY upon sixty <br /> (60) days prior written notice . <br /> 3 . The provisions and stipulations of this Agreement are a part of the consideration of the <br /> licensing of the CROSSING SITE, and in the event the COUNTY shall fail to comply with any <br /> of the covenants and conditions , then, at the option of the RAILWAY, this Agreement shall be <br /> terminated with full legal rights and remedies retained by the RAILWAY, including but not <br /> limited to the right to reenter, repossess, and remove the crossing if it shall elect to do so . <br /> 4 . The COUNTY shall grant forthwith to the RAILWAY necessary permits for the <br /> installation, construction, erection, repair and maintenance of any of the RAILWAY-owned or <br /> maintained facilities described in this Agreement . If the COUNTY fails to promptly grant the <br /> xFRno499 Page 2 <br /> � I <br />
The URL can be used to link to this page
Your browser does not support the video tag.