Laserfiche WebLink
FLORIDA EAST COAST RAILWAY COMPANY <br /> (_XNGEST.WK4) 04/08/03 <br /> SAINT AUGUSTINE, FLORIDA <br /> 15 :05 <br /> VERO BEACH; WIDEN EXISTING 44' TYPE "T" MODIFIED GRADE CROSSING TO 112' CONCRETE CROSSING. <br /> 4TH STREET, MILEPOST 229+3,982' AAR/DOT NO, 273049M <br /> FILE: 229/39/3982 <br /> CROSSING DESCRIPTION PAVING DESCRIPTION <br /> New Length of Crossing Surface: 112 Tf Width (Across Road) 112 Ft <br /> Number of Tracks : 1 Ea Length (Along Road) 80 Ft <br /> Length of Track Panel : 152 Tf <br /> Projected Lift 3 In <br /> AGREEMENT DESCRIPTION GANG DESCRIPTION <br /> Responsible Party: Indian River County 3 Fort Pierce Section <br /> Agreement Date: 14 Fort Pierce Smoothing <br /> Division of Responsibility 3 Crane <br /> Encase Fiber Optic Cable COUNTY 2 Loader <br /> Maintenance of Traffic COUNTY <br /> Crossing Surface COUNTY <br /> Track Materials COUNTY <br /> Track Construction COUNTY <br /> Paving COUNTY <br /> COST RECAPITULATION Salvage 10.00% Responsible <br /> Track & Civil Work Item Labor Equipment Material Contract Credit Contingency Total Party <br /> Encase Fiber Optic Cable n/a n/a n/a 900.00 n/a 1 ,000.00 1000. 00 COUNTY <br /> Mobilization/Material Consolidation 1 ,877. 64 2,061 . 18 n/a n/a n/a 461 . 18 4,400. 00 COUNTY <br /> Construct Track Panel 1 ,729. 72 2,334. 84 12, 875 .07 n/a n/a 1 ,760. 36 18, 700. 00 COUNTY <br /> Maintenance of Traffic/Police Protection n/a n/a n/a 223720. 00 n/a 27280. 00 25,000. 00 COUNTY <br /> Remove Crossing Surface 300. 38 469.31 n/a n/a (675 .00) 105 . 31 200. 00 COUNTY <br /> Remove/Replace Track/Crossing Structure 3,089. 72 43428 . 39 n/a n/a (4,475 .23) 357. 13 3,400.00 COUNTY <br /> Line & Surface Track 851 . 82 651 . 83 4,065. 80 n/a n/a 630. 56 63200. 00 COUNTY <br /> Replace Crossing Surface 764.61 1 , 194. 61 30,020. 80 n/a n/a 33219. 98 35,200. 00 COUNTY <br /> Place Asphalt 168. 50 28 .45 n/a 2200. 00 n/a 2,323 .06 25,200. 00 COUNTY <br /> Demobilization/Site Cleanup 469.00 67.48 n/a n/a n/a 63 . 52 600.00 COUNTY <br /> -- ---------- ---------- ---------- ---------- <br /> ---------- ---------- <br /> Totals: 9,251 . 39 11 ,236.08 46,961 .67 5500.00 (5, 150.23) 12,201 . 09 129,500.00 <br /> TOTAL TRACK PROJECT COST: $1299500.00 1 , 156. 25 $/Ft <br /> ENGINEERING & SUPERVISION: 5,180.00 <br /> TOTAL TRACK & CIVIL PROJECT COST: $1349680.00 <br /> TOTAL SIGNAL IMPROVEMENT PROJECT COST: 2849960.00 <br /> TOTAL COST TO BE BORNE BY COUNTY: $4199640.00 #REF! <br /> NOTE: THIS IS AN ESTIMATE ONLY, ALL CHARGES WILL BE BASED ON ACTUAL COST. Modd 1a Rmsed 7/17/97 <br /> EXHIBIT " B " <br />