My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-097
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2016 9:50:51 AM
Creation date
10/1/2015 12:02:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/08/2008
Control Number
2008-097
Agenda Item Number
8.J.
Entity Name
Lucas Marine Construction LLC
Subject
Change Order No.7 Main Relief canal Pollution control system
Area
Main Relief Canal
Bid Number
2007066
Supplemental fields
SmeadsoftID
6944
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03 ! 26 . 2003 16 : 05 7722561139 LMC: PA3E 02105 <br /> L MCI LUCAS MARINE CONSTRUCTION , LLC <br /> March 26, zoos <br /> Indian River County Public Works <br /> 4375 43 " Ave . <br /> Vero Beach, FL 32467 <br /> Attn: Mr. Keith McCully, Clifford Suthard, Stormwater Division <br /> RE: Main Relief Canal Pollution Control System <br /> PCG 07-1600-006-R2 <br /> Gentlemen: <br /> As requested, we are submitting the following revised proposal for your consideration. We will <br /> provide all labor and equipment necessary to construct the outfall structure for the referenced <br /> project per the recent design that includes steel sheet pile. The itemized cost breakdown is <br /> attached. Please note that we have note included any concrete work in ttus proposal; any <br /> necessary concrete work will be billed per Item 3.01 of the Schedule of Values. <br /> The total change order amount requested is $41,002.59 (which excludes materials) and will <br /> require that twenty (20) calendar days be added to our current contract time. We have also <br /> excluded bonds and insurance expense, which will be recalculated upon completion of the <br /> project based on the final contract amount. If you have any questions or need additional <br /> information, please do not hesitate to contact us. <br /> Sin`ce� I <br /> relpy <br /> _ ` <br /> Bruce G. Smith <br /> Project Manager <br /> 3130 SE Slater St. a Stuart, FL 34997 a (772) 266-5094 a Fax (772) 2.136- 1139 <br />
The URL can be used to link to this page
Your browser does not support the video tag.