Laserfiche WebLink
03 / 25 / 2009 16 : 05 7722861139 LMC PAGE 05/ 85 <br /> FOR <br /> eoNeTwl.ICrrane <br /> SUBTOTAL ITEM 111.) $161985.90 <br /> Project Manager w/Pick Up Truck 606. 00 <br /> Overhead & Profit 31104 .45 <br /> TOTAL ITEM IIL) $20,696.35 <br /> SU Y.& TOTAL <br /> I.) Mobiliwdon/Demobilixatioil $4,267.47. <br /> II.) Furnish & install steel sheet pile 55,694, 82 <br /> 111.) Excavation & Additional Riprap 2006 . 35 <br /> TOTAL 580,658.59 <br /> Deduct direct cost for steel sheet pile and coating (to be included in a separate proposal) -39,656.00 <br /> GRANA TOTAL $41 ,002.59 <br /> PROJECT NAME: Main Relief Canal Pollution Control Project <br /> PROJECT NO. : 07- 1500 <br /> REFERENCE NO.: PCO 07- 160MO&R2 <br /> ':'IMPORTANT - PLEASE READ"' <br /> Any terms, conditions, clarifications or exclusions contained in the referenced correspondence apply. This breakdown <br /> does not stand alone, it must be accompanied by a signed proposal for the work described herein. <br /> Page 3 of 3 Pam: <br />