Laserfiche WebLink
03/25/2009 16:05 7722861139 LMC PAGE 05/85 <br />FOR <br />eoNeTwl.ICrrane <br />SUBTOTAL ITEM 111.) 5161985.90 <br />Project Manager w/Pick Up Truck 606.00 <br />Overhead & Profit 31104.45 <br />TOTAL ITEM IIL) 520,696.35 <br />SUMMAWY.4 TOTAL <br />I.) Mobiliwdon/Demobilixatioil $4,267.41. <br />II.) Furnish & install steel sheet pile 55,694,82 <br />111.) Excavation & Additional Riprap 2006.35 <br />TOTAL 580,658.59 <br />Deduct direct cost for steel sheet pile and coaxing (to be included in a separate proposal) -39,656.00 <br />GRANA TOTAL $41,002.59 <br />PROJECT NAME: Main Relief Canal Pollution Control Project <br />PROJECT NO.: 07-1500 <br />':'IMPORTANT - PLEASE READ"' <br />Any <br />terms, conditions, clarifications or exclusions <br />contained in the <br />referenced correspondence apply. This breakdown <br />does <br />not stand alone, it must be accompanied by a <br />signed proposal <br />for the work described herein. <br />Page 3 of 3 Pam: <br />