Laserfiche WebLink
MARINE CONSTRUCTION, LLC <br />Contract Number <br />W.O. Number <br />of Work <br />07=1600 <br />Excavate <br />Description <br />Cell <br />CHANGE ORDER PROPOSAL <br />IRC Pollution Control Structure <br />Date: <br />10/1 <br />or <br />Regular Hours <br />Overtime <br />Rate Rate <br />Amount <br />kForeman <br />erator <br />Labor <br />2 Das 22.00 <br />2 Das 22.00 <br />2 Das 22.00 <br />Hours <br />(Overtime) <br />$30.00 <br />$22.00 <br />$18.00 <br />$660.00 <br />$484.00led <br />$396.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Subtotal <br />$1,540.00 <br />Workmens <br />Comp. / Insurance 35% <br />$539.00 <br />Subtotal <br />$2,079.00 <br />Equipment <br />merican 7250 Crane <br />Front End Loader <br />Pick U Truck <br />11 <br />Unit Das Rate <br />Da 2.00 $500.00 <br />Da 2.00 $200.00 <br />Da 2.00 $100.00 <br />Amount <br />$1,000,001 <br />$400.00 <br />$200.00 <br />$0.00 <br />