My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-018
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 8:52:52 AM
Creation date
9/30/2015 8:09:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/17/2006
Control Number
2006-018
Agenda Item Number
7.M.
Entity Name
Lucas Marine Construction, Inc.
Subject
contract for Oslo Road bridge replacement
Area
Oslo road (CR 606)
Project Number
9705B
Bid Number
2006024
Supplemental fields
SmeadsoftID
4451
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Flanged pipe with screwed - on flanges shall be furnished with long <br /> hubs , and the flanges shall be screwed on the threaded end of the <br /> pipe in the shop , and the face of the flange and end of pipe refaced <br /> together . There shall be no leakage through the pipe threads and the <br /> flanges shall be designed to prevent corrosion of the threads from <br /> outside . The back of the hub shall be caulked where the hub threads <br /> joint with the pipe . <br /> 5 . Valve Box Adjustments : <br /> Cost of valve nut extenders shall be included in cost of valve box <br /> adjustments where needed . <br /> E . Disinfecting Potable Water Pipelines <br /> Before being placed in service , all potable water pipelines shall be <br /> chlorinated in accordance with the latest edition of AWWA C - 651 , <br /> Standard Procedure for Disinfecting Water Mains " , except that the use of <br /> tablets is strictly prohibited . The procedure shall be approved by the <br /> Engineer . The location of the chlorination and sampling points will be as <br /> specified by the Florida Department of Environmental Protection , Water <br /> Distribution System Permit . Taps for chlorination and sampling shall be <br /> uncovered and backfilled by the Contractor , as required . <br /> F . Aerial Crossing Painting Requirements <br /> 1 . The Contractor shall furnish all labor , materials , equipment and incidentals <br /> required to paint all components as herein specified . <br /> 2 . The Work includes the painting and finishing of all exposed exterior surfaces . <br /> 3 . The term " paint " as used herein means all coating system materials , which <br /> includes pretreatment , primers , emulsions , enamels , sealers and fillers , and <br /> other applied materials whether used as prime , intermediate or finish coats . <br /> 4 . Flanged exposed piping shall have a paintable sealant placed between the <br /> back of the flange and the threaded pipe end connection . The back of the <br /> flange shall be prepared prior to the application of the sealant . <br /> 5 . Provide finish coats , which are compatible with the prime paints used . <br /> Contractor shall be responsible for the compatibility of all shop primed and <br /> field painted items . Furnish information on the characteristics of the finish <br /> materials proposed for use to ensure that compatible prime coats are used . <br /> Provide barrier coats over incompatible primers or remove and reprime as <br /> required . Notify the Engineer in writing of anticipated problems using the <br /> coating systems as specified with substrates primed by others . <br /> 6 . Surface Preparation : <br /> a . Clean ferrous surfaces that have not been shop - coated of all oil , <br /> grease , dirt , loose mill scale and other foreign substances by near <br /> white blast cleaning , complying with SSPC - SP 10 . 5 . Treat bare and <br /> blasted or pickled clean metal with metal treatment wash coat , prior <br /> to priming only if recommended by the paint manufacturer . <br /> TECHNICAL PROVISIONS <br /> TP - 13 <br /> .. FAPublic Works\Capital Projects\Oslo Road Lateral J\BID DOCUMENTS\DIVISION 2 - Technical Provisions . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.