Laserfiche WebLink
Monk <br /> 13 . Description : Decrease Bid Item 2 . 12- 13 by 218 . 75 square feet . <br /> Reason : This quantity of steel sheet piling was not used . <br /> Change in Contract Price : Decrease = 218 . 75 SF * $ 38 . 00/SF = ($ 8 , 312 . 50 ) <br /> Attachments : None <br /> 14 . Description : Decrease Bid Item 2 . 13 by 23 lineal feet . <br /> Reason : This quantity of chain link fence material was not used . <br /> Change in Contract Price : Decrease = 23 LF * $ 34 . 00/LF = ($ 782 . 00 ) <br /> Attachments : None <br /> 15 . Description : Delete Bid Item 2 . 16 by 107 square yards . <br /> Reason : This quantity of Bahia sod was not used . <br /> Change in Contract Price : Decrease = 107 SY * $ 3 . 00/SY = ($ 321 . 00 ) <br /> Attachments : None <br /> 16 . Description : Decrease Bid Item 2 . 18 for non -potable water pipe and associated <br /> equipment that was not installed . ( Includes 77 lineal feet of 2 - 1 /2 " PVC pipe , one <br /> spring rewind reel , 1 "x100 ' water hose , one fog nozzle , fittings , NPW sign and post , <br /> etc . ) <br /> Reason : These materials were not installed because the Sediment Recovery Area <br /> was deleted from the Contract . <br /> Change in Contract Price : Decrease = ($ 1 , 500 . 00 ) <br /> Attachments : Letter from Bruce G . Smith , Lucas Marine Construction , LLC to Keith <br /> McCully , IRC , dated January 6 , 2009 <br /> 17 . Description : Delete Bid Item 2 . 33 . <br /> Reason : The sedimentation pump and motors were deleted from the Contract . <br /> Change in Contract Price : Decrease = ( $2 , 500 . 00 ) <br /> Attachments : None <br /> 18 . Description : Increase Bid Item 3 . 01 by 10 . 44 cubic yards . <br /> Reason : This quantity reinforced concrete was increased during construction . The <br /> additional concrete was required for a protective cap over a steel sheet piling <br /> headwall at the box culvert discharge and for additional concrete pedestals to <br /> support the conveyor systems . <br /> Change in Contract Price : Increase = 10 . 44 CY * $ 850 . 00/CY = $ 8 , 874 . 00 <br /> Attachments : None <br /> 19 . Description : Delete Bid Item 3 . 02 , <br /> Reason : This quantity of extra excavation was not required . <br /> Change in Contract Price : Decrease = ($ 1 , 200 . 00 ) <br /> Attachments : None <br /> 20 . Description : Delete Bid Item 3 . 03 . <br /> Reason : This quantity of extra imported fill material was not required . <br /> Change in Contract Price : Decrease = ($2 , 000 . 00 ) <br /> Attachments : None <br /> Change Order No . 010 - Final <br /> Change Order - Page 3 of 5 <br /> FAPublic Works\KeithM\Stormwater Projects\Main Relief Canal\Change Orders\Change Order No . 010 - Final Change <br /> Order\Change Order No 010 - Final Change Order.doc Last revised 9/27/01 <br />