Laserfiche WebLink
IRRIGATION SYSTEM - OPINION OF CONSTRUCTION COST <br /> SR 5/ US I <br /> Indian River County <br /> FPID 228583 -5-52-01 <br /> Prepared By: Masuen Consulting, LLC <br /> Date: September 7, 2006 <br /> Revised: N/A <br /> Pay Item Item Unit city. Unit Price Total <br /> PVC Main Line <br /> 4" LF 8 ,450 $6. 50 1 1 $54.925.00 <br /> PVC Lateral Line _ _ <br /> 3/4" - 21 /2" LF 14,235 $3.00 1 $42,705.00 <br /> PVC Sleeving _ <br /> 8" LF 1 ,350 $11 .00 1 $ 14,850.00 <br /> 2" gray LF 1 ,350 $4. 50 1 1 $6,075.00 <br /> Ductile Iron GV <br /> 4" 1 1 LF 1 1 2 $800.00 1 1 $1 ,600.00 <br /> RCV <br /> 590-70 <br /> 2" 1 1 EA i 27 $600.00 $16,200.00 <br /> EA 1 4 $500.00 1 1 $2,000.00 <br /> Spray Heads <br /> 6" and 12" and Risers EA 895 1 $50.00 $44,750.00 <br /> Pump Station <br /> Hoover HSF-S.00S , 23013-A,E40 ,W EA 1 $10 ,000.00 $ 10,000.00 <br /> Sub Total $ 193, 105. 00 <br /> Profit/Overhead $38,621 .00 <br /> 590-70 Grand Total LS 1 $231 ,726.00 <br />