My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-135
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 10:45:53 AM
Creation date
9/30/2015 10:43:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/17/2007
Control Number
2007-135
Agenda Item Number
7.S.
Entity Name
Florida Department of Transportation
Subject
Maintenance Memorandum of Agreement
Area
SR 60 west of 82nd Ave.to 66th Ave.
Project Number
228627-1-52-01
Supplemental fields
SmeadsoftID
6261
Document Relationships
2007-038
(Attachment)
Path:
\Resolutions\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State Road : 60 <br /> Limits : 82nd Ave to 66"' Ave <br /> FM No. : 228627-1 -52-01 <br /> Agency : Indian River County <br /> Date : 2/19/2007 <br /> Contact : Mr. James W. Davis (Public Works Director) <br /> 1840 25 "' Street, Vero Beach, FL 32960 <br /> Ph . 772-567-8000 ext. 1245 <br /> MAINTENANCE PLAN <br /> The purpose for the following performance based descriptions of landscape maintenance <br /> practices is to allow the plant material on your project to thrive in a safe and vigorous <br /> manner. Plantings shall be maintained to provide required visibility and conform to all of <br /> the required setbacks as set forth by Florida Department of Transportation ' s governing <br /> standards and specifications : FDOT Design Standards (2006) and Standard Specifications <br /> for Road and Bridge Construction (2007), as amended by contract documents . <br /> Watering Requirements : <br /> Watering is probably the most critical concern regarding the maintenance of healthy <br /> established plant material . The amount of water to apply at any one time varies with the <br /> weather, drainage conditions and water holding capacity of the soil . <br /> Proper watering techniques should provide even and thorough water dispersal to wet the <br /> entire root zone but not to saturate the soil and should avoid over-spray onto travel lanes . <br /> Furthermore, the Agency should maintain the rain sensors (if on an irrigation system) to <br /> ensure that they are functioning properly and that the system does shut down when there <br /> is sufficient rainfall . <br /> Avoid extremes in watering. Light, frequent watering is ineffective on established <br /> plantings and produces shallow root systems . Excessive watering that keeps the root <br /> zones saturated may kill the plant material due to the lack of available air to the root <br /> zone . A typical rule of thumb is that turf areas should receive on an average, a minimum <br /> of I " of water per week, with an equal or lesser amount for trees and shrubs , depending <br /> on their individual water usage. <br /> Irrigation : <br /> The irrigation system must be maintained to ensure there is no roadway overspray or <br /> irrigation activity during the daytime hours (most notably rush hour traffic periods) . <br /> Fertilization/Insecticides/Fungicides : <br /> Due to the poor shallow root soils of the South Florida area, coupled with heavy rainfall <br /> during the growing season, available nutrient levels for landscape materials are very low, <br /> therefore nutrient amendments are essential . A soil analysis of each planting site should <br /> be done to determine the nutrient levels needed to maintain vigorous plant growth . <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.