My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-050
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2016 1:20:24 PM
Creation date
9/30/2015 11:58:52 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/12/2008
Control Number
2008-050
Agenda Item Number
7.J.
Entity Name
Malcolm Pirnie Inc.
Subject
Attachment 1 to Work Order No.M2 Services for Main Relief Canal
Pollution Control System
Area
Main Relief Canal
Supplemental fields
SmeadsoftID
6897
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f t <br /> rl 4J <br /> LTC) <br /> ATTACHMENT 1 to WORK ORDER NO, M2 <br /> LABORATORY SUPPORT SERVICES AND REPORTING FOR THE MAIN <br /> RELIEF CANAL POLLUTION CONTROL SYSTEM <br /> SCOPE OF WORK <br /> The COUNTY has requested that the CONSULTANT provide professional engineering <br /> services for the preparation of reporting requirements as set forth in the Quality Assurance <br /> Project Plan ( QAPP) for the COUNTY' s Main Relief Canal Pollution Control System <br /> Project . This reporting is required by a Florida Department of Environmental Protection <br /> ( FDEP) 319 Grant Contract ( DEP Contract No . G0182 , dated April 11 , 2006) . The <br /> following tasks provide the necessary cross-section of activities associated with the <br /> requirements of the QAPP and the FDEP 319 Grant Contract pertaining to the one-year <br /> monitoring period after construction is complete . <br /> Task No. 1 — KICKOFF MEETING - conduct kickoff meeting (telephone conference call ) <br /> with COUNTY to discuss report format and assemble pertinent information concerning the <br /> project as it relates to the required reporting requirements . <br /> Task No. 2 — LABORATORY COORDINATION — CONSULTANT will retain the services <br /> of an analytical laboratory that will analyze vegetation and water samples . The vegetation <br /> and water samples will be collected and forwarded to the analytical laboratory by <br /> COUNTY . The subconsultant analytical laboratory will provide a report documenting the <br /> analytical results of each sampling event to CONSULTANT. <br /> Task No. 3 — QUARTERLY REPORTING — CONSULTANT will incorporate laboratory <br /> analytical results into a report, on a quarterly basis , in accordance with the quarterly <br /> reporting requirements of the FDEP 319 Grant Contract, Attachment H . There will be a <br /> total of two quarterly reports submitted for quarters 1 and 3 , with the second quarterly <br /> report being incorporated into the Preliminary Project Report as described in Task No . 4 <br /> below and the fourth quarterly report being incorporated into the Final Project Report as <br /> described in Task No . 5 , below . COUNTY will submit all field notes , water sampling logs <br /> and chain of custody forms to CONSULTANT within two days of each of the 19 sampling <br /> events ( 12 monthly and 7 storm event sampling events) . Water samples will be collected <br /> at all 19 events ; however vegetation will only be collected during the 12 monthly events . <br /> Analytical sampling results and field information will be assembled into a report that will be <br /> sent to COUNTY to include in the Quarterly Reporting Requirements of the FDEP 319 <br /> Grant Contract. COUNTY will assemble and submit two hard copies of each quarterly <br /> report to the FDEP contract manager upon receipt of the laboratory analytical report from <br /> CONSULTANT. <br /> Task No. 4 — PRELIMINARY PROJECT REPORT — A preliminary report will be prepared <br /> that will assess the effectiveness of the project at the mid - point of the water quality <br /> monitoring program and will reflect a summary of Quarter 1 and Quarter 2 data . The <br /> preliminary project report will address the history and purpose of the project, overview <br /> summary of the project ( pre and post-construction ) , analytical results , and effectiveness <br /> Page 2 of 5 <br /> H :A0PROPA2008VIndian River County\Main Relief Canal Reporting\Work Order M2 - Final .dOe <br />
The URL can be used to link to this page
Your browser does not support the video tag.