My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-051
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:42:48 AM
Creation date
9/30/2015 11:58:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/12/2008
Control Number
2008-051
Agenda Item Number
7.K.
Entity Name
Malcolm Pirnie
Subject
Work Order No.3-EM Engineering services final redesign and construction
Egret Marsh Regional Stormwater Park
Supplemental fields
SmeadsoftID
6898
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 9 to WORK ORDER NO, 3 -EM <br />ADDITIONAL ENGINEERING SERVICES FOR EGRET MARSH REGIONAL <br />STORMWATER PARK FINAL REDESIGN AND CONSTRUCTION <br />PROJECT SCOPE <br />The COUNTY is preparing an alternate design for the Egret Marsh Regional Stormwater <br />Park (Egret Marsh). The CONSULTANT shall assist the COUNTY in the alternate design <br />and subsequent construction by providing certain professional engineering services. <br />Specific tasks follow: <br />2. DESIGN SERVICES <br />Task No. 1 — COMPUTER DRAFTING SERVICES — provide computer aided drafting <br />(CAD) services for approximately seven civil and mechanical construction drawings. <br />Task No. 2 — STORMWATER MODELING — provide stormwater modeling services for the <br />post -construction site as required by Indian River County, including a final stormwater <br />modeling report. <br />Task No. 3 — ENGINEERING SERVICES — provide professional engineering services as <br />necessary to assist the COUNTY in its redesign efforts. These services will include, but <br />may not be limited to electrical engineering services. <br />Task No. 4 — SHOP DRAWING REVIEW AND RESPONSE TO CONTRACTOR'S <br />REQUEST FOR INFORMATION SUBMITTALS — provide structural and electrical <br />engineering services as necessary for shop drawing reviews and respond to contractor <br />requests for information during the construction period. <br />Task No. 5 — SITE VISITS DURING CONSTRUCTION AND ASSOCIATED MEMOS — <br />conduct up to 12 site visits to the project construction site to observe and review project <br />construction activities. Prepare and submit to the COUNTY, a memo summarizing <br />observations made during each site visit. <br />Task No. 6 — STARTUP SITE VISIT AND MEMO - conduct a site visit to the project <br />construction site at the time of scheduled startup to observe and review project activities. <br />Prepare and submit to the COUNTY, a memo summarizing observations made during the <br />startup site visit. <br />**END OF ATTACHMENT 1** <br />2 <br />CADocuments and SettingsUmarino\Local SettingsUemporary Internet FileslContent.Outlook\BGUD33FE\Malcolm Pimie Work Order <br />#3 -EM - FINAL.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.