My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-051
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:42:48 AM
Creation date
9/30/2015 11:58:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/12/2008
Control Number
2008-051
Agenda Item Number
7.K.
Entity Name
Malcolm Pirnie
Subject
Work Order No.3-EM Engineering services final redesign and construction
Egret Marsh Regional Stormwater Park
Supplemental fields
SmeadsoftID
6898
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 3 to WORK ORDER NO. 3 -EM <br />ADDITIONAL ENGINEERING SERVICES FOR EGRET MARSH REGIONAL <br />STORMWA TER PARK FINAL REDESIGN AND CONSTRUCTION <br />TIME FOR COMPLETION <br />The CONSULTANT's time -of -completion for engineering design services covered <br />by this Work Order depends on County staff's ability to get information to the <br />CONSULTANT. The engineering design portion of the work is anticipated to be complete <br />within 30 calendar days from the date the necessary information is transmitted to the <br />CONSULTANT by County staff. The CONSULTANT's time -of -completion for the <br />remainder of the work herein depends on the construction schedule determined by the <br />construction contract. Said construction schedule is anticipated to range from 300 to 360 <br />calendar days. <br />**END OF ATTACHMENT 3** <br />4 <br />C:Tocuments and SettingsNmanno\Local Settings\Temporary Internet FileslContent.OutookOGUO33FE\Malcolm Pimie Work Order <br />#3 -EM - FINAL.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.