Laserfiche WebLink
Indian Rimer Country - Marks Mobil Site, Veru Reach , EI. Septemhe�r 23, 2009 <br /> Foam - Dill Tank Closure & LTCAR Proposal Pakie 2 of 4 <br /> Sell <br /> The FDEP allows tank closure to be performed without satrlpling at sites that are eligible <br /> (or the cleanup progrume based on Florida Statute 376 . 30716 . The FDEP FIRST Cover <br /> Page Report researched by ERMI in the preparation of this proposal states that the site is <br /> eligible for the cleanup program . Due to the nature of the closure and the referenced <br /> statute , ERMI will not be samplingo soil or groundwater as part of this project . <br /> As stated above , toam - fill closure is a DEP approved method of tank closure and we are <br /> not aware of any local ordinance prohibiting foam till closures at the subject property . If <br /> the local government permitting authority does not approve the required permit for this <br /> project , which is not anticipated , then ERMI will return the deposit , and the foam <br />fill <br /> contract will be null and void , <br /> QUALITY ASSURANCE AND QUALITY CONTROL <br /> The environmental sampling and reporting scope of services must be desiuned and <br /> conducted under the supervision of a licensed State of Florida Professional Geologist or <br /> Fnuincer . ERMI is a Licensed Engineering Firm 000008700 ) , Licensed Geology <br /> I3r.tsiness ( 4GI3000367 ) , and FDEP Petroleum Cleanup Contractor ( # 00542 ) , 1 RMI <br /> adheres to duality assurance guidelines outlined in Florida Administrative Code ( FAC ) <br /> Rule 62 - 160 and Florida Department of Fnvironmental Protection Standard Operating <br /> Procedures . <br /> SPECIFIC EXCLUSIONS TO THIS CONTRACT <br /> The following items are not included within this cost proposal . If these services are <br /> deemed necessary , additional costs will apply : <br /> A . Remo � al and disposal of any contaminated soil or groundwater , if <br /> encountered . <br /> 13 . Asphalt and/ or concrete re - surfacing , with the exception of the 4 - inch <br /> diameter boreholes installed Sun401111 ( iing the UST Carm . <br /> C . Electrical generator, if on - site electrical power is not provided . <br /> D . Mobile water tank, ifon - site water is not provided by the owner . <br /> E . Damage to utilities or any underground materials . <br /> UTILITIES & SITE SAFETY <br /> Phis project includes intrusive investigation services . On any such project , the possibility <br /> exists for damage to an underground utility line or other subterranean Structure durinky the <br /> couUSe of the investigan <br /> tio . <br /> LRMI recluestS the use of a reliable site Survey when determining sample locations . <br /> ERN,11 rectuests that the property owner provide notice of anti Subterranean materials in <br /> the area of proposed intrusive activity . ERMI requests the use of any site plans that may <br /> be available to assist with locating; subterranean materials prior to intrusive testing . <br /> ERtiII will rely on these documents and will plot our Sample locations based on the open <br /> spaceS identified in the surveys . If this information is not provided prior to or concurrent <br /> Environmental Risk Management, Inc. ERMI Fite No. E232SA <br />