Laserfiche WebLink
AMENDMENT #1 <br /> TO <br /> "EXHIBIT #2" <br /> 1 /24/2008 <br /> LUMP SUM FEE TABULATION <br /> INDIAN RIVER COUNTY <br /> REPLACEMENT OF 8" FM WITH A 16" REUSE MAIN AND PIPING ADDITIONS <br /> ASSISTANCE DURING BIDDING AND CONTRACT AWARD <br /> CONTRACT ADMINISTRATIONIPERIODIC CONSTRUCTION OBSERVATION <br /> Professional Engineer Proiect Engineer Designer CAD Administration <br /> $ 155.00 $ 125.00 $ 80.00 $ 45.00 Total Costs Comments <br /> Hours Amount Hours Amount Hours Amount Hours Amount <br /> Engineering Design 90 $ 132950.00 40 $ 52000.00 174 $ 13,920. 00 4 $ 180. 00 $ 332050. 00 <br /> Preparation of <br /> Construction Plans 10 $ 11550.00 40 $ 5,000.00 326 $ 26,080. 00 4 $ 180.00 $ 32, 810.00 <br /> Prepare Specifications <br /> and Bid Documents 50 $ 71750.00 0 $ 0 $ 62 $ 2,790.00 $ 10, 540.00 <br /> Total (hrs/cost) 150 $ 232250.00 80 $ 10,000.00 500 $ 40,000.00 70 $ 3 , 150. 00 $ 76,400.00 <br /> Surveying $7, 150. 00 <br /> TOTAL $ 83, 550.00 <br /> Fne#06271A <br /> VMm1PrOle S2006WS27%ADMIN\Cmrads%AMENDMENTk110627Se menhours Art n#1 012408.xis <br /> Design Smites — — — <br />