My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-055
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 11:51:45 AM
Creation date
9/30/2015 11:59:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
02/12/2008
Control Number
2008-055
Agenda Item Number
11.J.1
Entity Name
Masteller & Moler
Subject
Amendment No.1 to Work Order No.4 Services contract Force Main Replacen
Area
Lateral G Canal from 57th St. to Hobart Road
Supplemental fields
SmeadsoftID
6902
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br />CONTINUING CONSULTING SERVICES <br />AMENDMENT#1 <br />TO <br />"EXHIBIT #3" <br />• Time of Performance <br />Our File #0627 <br />January 24, 2008 <br />The estimated time frame for completion of services from the approval of this Amendment #1 to Work <br />Authorization #4 is as follows: <br />MILESTONE <br />COMPLETION DATE <br />Surveying Services and Base <br />Plans; Engineering Design & <br />Preparation of Construction Plans April 30, 2008 <br />Project Construction Services Completed October 31, 2008 <br />Dates are based on assumption that County Commission will approve during February, 2008. <br />Y:4nmlProjeds\2006\0627V1DMIN1ContradsWMENDMENT#1W627_Exhibk 3_Amen#1_012408.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.