EXHIBIT "A" <br /> 1 RELOCATE 4" AND 8" SCUM LINES Add $3,010 .00 <br /> LOCATION : 30" Secondary Clarifier Effluent to the Automatic Backwash Filter <br /> The existing 4" Scum line and the existing 8" WAS line running between the new clarifier and the fitter <br /> have a center line elevation of 12 . 80' . The new 30" effluent line has a centerline elevation of 13 .25' . <br /> The existing lines were lowered below the 30" line utilizing mechanical joint 45 degree bends with <br /> accessories . (4 each 4" MJ 45 and 4 each 8" MJ with megalugs and labor. ) <br /> 2 CLARIFIER / FILTER ALIGNMENT Add $23983 .00 <br /> LOCATION : 30" Secondary Clarifier Effluent ( 30" x 16" Tee, Spool Piece, & 30" 90 Degree <br /> Bend) <br /> The east / west centerline dimension of the new Clarifier No. 3 and the new Backwash Filter are offset <br /> approximately 20" . Referring to Drawing M7 , the makeup of the 30" Tee, the 30" spool piece, and the <br /> 30" 90 degree bend is approximately 64" . The Contract Drawings show the 30" pipe from the 90 <br /> degree bend at the Clarifier installed over to the center of the filter. Due to the 5'4" offset additional <br /> fittings are required . <br /> The 30" influent pipe (the 90 degree bend and embedded slab pipe at the filter) will be turned on a 45 <br /> degree angle out from the filter. ( 1 each 30" MJ 45 degree bend with megalugs and labor.) <br /> 3 30" PIPE / DUCTBANK CONFLICT Add $ 10, 580 .00 <br /> LOCATION : 30" Secondary Clarifier Effluent to the Automatic Backwash Filter <br /> Existing electrical ductbank is located in the same location as the new 30" effluent from the new Filter. <br /> The pipe will be relocated to avoid the conflict with the ductbank. (2 each 30" MJ 45 degree bends and <br /> pipe relocation labor. ) <br /> 4 CLARIFIER INFLUENT ELEVATIONS Add $39012.00 <br /> LOCATION : 20" Secondary Clarifier Influent <br /> Pipe elevation problems : The new 20" clarifier influent pipe elevations are shown on the drawings at <br /> differnet elevations . Due to the different elevations and the location of the existing pipe that the new <br /> pipe ties into, the space needed to make the connection needs to be increased . Excavate more of the <br /> existing pipe and cut the pipe to install the new piping . ( 1 each solid sleeve and labor. ) <br /> 5 PISTA GRIT - HEADWORKS COATING REPAIR Add $950.00 <br /> The Special Coating installed in the Pista Grit Chamber ( installed on the original project) had <br /> delaminated from the concrete. The old coating was removed , the damaged area was sandblasted and <br /> new coating applied . <br />