Laserfiche WebLink
T EXHIBIT "A" <br /> 11 ELECTRICAL VALUE ENGINEERING Ded -$30, 778.40 <br /> Electrical Value Engineering and Deletion of Scum Trough <br /> Revising the conduit and cable to the new influent pump -$9, 378. 40 <br /> Change feeder to new EFF-2 ( 100HP motor) from 6" aluminum conduit w/250MCM <br /> Deletion of the cable try system -$2, 500. 00 <br /> Deletion of the scum trough att he disinfection basin -$ 187900. 00 <br /> 12 ADDED CHLORINE EDUCTOR & PIPING Add $750 .00 <br /> As directed this chlorine eductor was added to add chlorine into the system at the Clarifiers . <br /> 13 DELETION OF BAFFLE WALL - DISINFECTION BASIN Ded -$ 1 ,950 .60 <br /> Since the new disinfection basin does not have Effluent pumps, the anti-vortex walls were not needed <br /> and deleted . <br />