My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-287
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-287
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 11:33:58 AM
Creation date
9/30/2015 9:58:04 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
08/22/2006
Control Number
2006-287
Agenda Item Number
7.X.X.
Entity Name
Masteller & Moler, Inc.
Subject
Central Region WWTP Expansion-Change Order No. 001
Supplemental fields
SmeadsoftID
5778
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T EXHIBIT "A" <br /> 11 ELECTRICAL VALUE ENGINEERING Ded -$30, 778.40 <br /> Electrical Value Engineering and Deletion of Scum Trough <br /> Revising the conduit and cable to the new influent pump -$9, 378. 40 <br /> Change feeder to new EFF-2 ( 100HP motor) from 6" aluminum conduit w/250MCM <br /> Deletion of the cable try system -$2, 500. 00 <br /> Deletion of the scum trough att he disinfection basin -$ 187900. 00 <br /> 12 ADDED CHLORINE EDUCTOR & PIPING Add $750 .00 <br /> As directed this chlorine eductor was added to add chlorine into the system at the Clarifiers . <br /> 13 DELETION OF BAFFLE WALL - DISINFECTION BASIN Ded -$ 1 ,950 .60 <br /> Since the new disinfection basin does not have Effluent pumps, the anti-vortex walls were not needed <br /> and deleted . <br />
The URL can be used to link to this page
Your browser does not support the video tag.