Laserfiche WebLink
IRC Work Order #7 <br />County Road 512 Ph. 3 — FINAL RNV monumentation <br />September 9th, 2008 <br />Page 2 of 9 <br />5. Set Permanent Reference Monuments along the Right of Way at all changes in <br />direction, including all Points of Curvature and Tangency. Provide State Plane <br />Coordinate values on all monumentation set. PRM's shall be an iron rod and disk <br />stamped as agreed and encased in a 4" by 4" concrete monument and shall be <br />placed at a maximum of 1000 feet apart. <br />6. Set Permanent Reference Monuments along related project properties as applicable. <br />PRM's shall be an iron rod and disk stamped as agreed and encased in a 4" by 4" <br />concrete monument and shall be placed at a maximum of 1000 feet apart. <br />7. Monument all Permanent Control Points (PCP's) along the baseline at all changes in <br />direction, including all Points of Curvature and Tangency. Provide State Plane <br />Coordinate values on all baseline control points. PCP's shall be a Parker Kaylon nail <br />and tab stamped as agreed and shall be placed at a maximum of 1000 feet apart. <br />8. Examine and review updated title report for twenty seven adjacent properties as <br />necessary. Include revisions on final map as necessary. Revise and update existing <br />Right of Way Map to depict all set or found monumentation and current title work as <br />applicable. Map shall adhere to attached Right of Way Map checklist (Exhibit "B"). <br />Provide copies for review and comment. Address comments and prepare mylars as <br />required. <br />SECTION III — TIME FOR COMPLETION & DELIVERABLESIWORK PRODUCT <br />1. Project shall be completed as follows: <br />a. Time of 80% - 90% PRELIMINARY review submittal shall be 60 calendar Days from <br />notice to proceed. <br />b. Time of FINAL project completion shall within 30 calendar days of receipt of the <br />County's review comments. <br />2. Deliverables -The SURVEYOR shall provide the COUNTY: <br />a. PRELIMINARY REVIEW. 80% - 90% product for County review and comments. One <br />(1) paper "hardcopy". County shall strive to provide review comments within 30 <br />calendar days of preliminary submittal. <br />b. FINAL one (2) paper "hardcopy" signed and sealed sets and one (1) signed and <br />sealed MYLAR sets in adequate recording fashion (I.E. Borders). Sheeted and <br />model space (as applicable) AutoCad drawing file and PDF formats on CD. <br />c. Survey set/sheets shall include a cover sheet with location sketch, survey <br />certifications, and related title and project No; a survey notes/legend/abbreviation <br />sheet, survey horizontal control sheet(s), right-of-way plan view sheets and/or as <br />indicated in the County supplied Right -of -Way map "checklist". <br />d. Work Product and digital versions are to prepared and submitted so that the <br />COUNTY or other consultants can readily use it for the design and analysis of the <br />area, as defined. It shall contain all information necessary for third -party surveyor to <br />independently recreate and/or utilize the survey work. It is acknowledged all final <br />products become property of Indian River COUNTY and will be available for use by <br />the public at large. <br />a. The SURVEYOR'S work product shall meet or exceed the minimum standards as <br />defined by Sections II, III and IV or the COUNTY will not approve the SURVEYOR'S <br />request for payment. <br />