My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-271
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2016 2:19:42 PM
Creation date
10/1/2015 12:32:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/09/2008
Control Number
2008-271
Agenda Item Number
8.K.
Entity Name
Masteller, Moler, Reed & Taylor
Subject
CR 512 Phase III Final R/W Monumentation Map Project
Area
CR 512 Roseland Rd.
Project Number
9611A
Supplemental fields
SmeadsoftID
7549
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Work Order #7 <br /> County Road 512 Ph . 3 — FINAL RNV monumentation <br /> September 9tt , 2008 <br /> Page 5 of 9 <br /> Exhibit " A" <br /> Proposal <br /> �- - -� Masteller, Moler, Reed & Taylor, Inc. <br /> 1655 27th Street, Suite 2 <br /> Vero Beach , FL 32960 <br /> Phone : 772-564-8050 <br /> Fax: 772-794-0647 <br /> e-mail : mmrpsm@bellsouth . net <br /> AGREEMENT FOR PROFESSIONAL SERVICES <br /> PROJECT: CR 512 Phase III R/W Monumentation Map PHONE: Work - (772) 567-8000 <br /> CLIENT NAME: Indian River County - Michael O'Brien PHONE: Fax - (772) 778-9391 <br /> SITE ADDRESS: County Road 512, Roseland Road to CR 510 MAILING ADDRESS : 1801 27th Street <br /> Sebastian, FL 32958 Vero Beach, FL 32960 <br /> Hereby requests and authorizes the following services: <br /> Perform RNV Monumentation Map for property located in Indian River County and identified as County Road 512 Phase 3 <br /> from Roseland Road to County Road 510 and includes the following Scope of Services: <br /> 1 . Project initiation and research, including review of existing files and field notes, preparation of work orders and field <br /> crew folders . <br /> 2 . Perform reconnaissance within the project limits. Recover existing monumentation to establish existing R/W lines, <br /> property lines, etc. Perform tie-in of existing monumentation including State Plane coordinates. <br /> 3. Coordinate with disk supplier with regards to stamping including review of samples and final ordering . <br /> 4. Set Permanent Reference Monuments along the Right of Way at all changes in direction , including all Points of <br /> Curvature and Tangency. Provide State Plane Coordinate values on all monumentation set. PRM's shall be an iron <br /> rod and disk stamped as agreed and encased in a 4" by 4" concrete monument and shall be placed at a maximum of <br /> 1000 feet apart. <br /> 5. Set Permanent Reference Monuments along related project properties as applicable. PRM's shall be an iron rod and <br /> disk stamped as agreed and encased in a 4" by 4" concrete monument and shall be placed at a maximum of 1000 feet <br /> apart. <br /> 6. Monument all Permanent Control Points (PCP's) along the baseline at all changes in direction , including all Points of <br /> Curvature and Tangency. Provide State Plane Coordinate values on all baseline control points . PCP's shall be a <br /> Parker Kaylon nail and tab stamped as agreed and shall be placed at a maximum of 1000 feet apart. <br /> 7. Examine and review updated title report for twenty seven adjacent properties as necessary. Include revisions on final <br /> map as necessary. Revise and update existing Right of Way Map to depict all set or found monumentation and <br /> current title work as applicable. Map shall adhere to attached Right of Way Map checklist ( Exhibit "B"). Provide copies <br /> for review and comment. Address comments and prepare mylars as required. <br /> 8 . Provide five (5) certified copies and a digital file of the survey and prepare its work product digital versions so that the <br /> County or other consultants can readily use it for the design and analysis of the area, as defined . <br /> We propose to perform the above described scope of services for a lump sum fee of $ 15,200.00. <br /> Additional charges may also apply for research and office work and expenses necessary to resolve problems with your <br /> legal description, conflicts with neighboring legal descriptions, and/or discrepancies due to adverse use, inaccurate or <br /> missing information . <br /> Respectively submitted ; <br /> 08- 11 -08 _ <br /> David Taylor, President Date <br /> Masteller, Molar, Reed & Taylor, Inc. <br /> PTP/Contracts2645.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.