Laserfiche WebLink
Our File #0627LC <br /> September 28 , 2009 <br /> NON -EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> AMENDMENT #3 TO <br /> " EXHIBIT 1 " <br /> Work Authorization #4 , which was approved by the Board of County Commissioners on July 11 , <br /> 2006 , included Engineering Services in connection with conversion of an existing 8 " force main <br /> to an 8" reuse pipeline . Amendment # 1 was approved to authorize Engineering Services for the <br /> removal of the existing 8 " force main and its replacement with a 16" reuse main in accordance <br /> with the Reuse Master Plan . Amendment #2 was approved to authorize modifications to the <br /> proposed route of the 16" reuse main to satisfy Indian River Farms Water Control District . <br /> Construction has commenced on the proposed 16" reuse water main along Lateral G Canal . <br /> However, in the course of construction the presence of listed wildlife species were discovered , <br /> specifically the gopher tortoise and Florida Scrub Jay . A " Notice To Suspend Work" was issued <br /> by the Utilities Department on or about September 17 , 2009 , and will remain in effect until listed <br /> species issues are resolved . <br /> Also , Utilities Department Staff has identified additional work to be performed in conjunction with <br /> the construction of the 16" reuse main . The additional work includes the reconstruction of an <br /> existingy connection between an existing 12" reuse main and an existing 6" sewer force main in <br /> the 57t Street right-of-way just west of Lateral G Canal , and the construction of a sewer check <br /> valve system in the Bent Pine Golf Club site . <br /> This Amendment #3 is presented to include tasks for additional professional services necessary <br /> to define the areas inhabited by endangered species and determine whether State or Federal <br /> permits will be required , and the additional design and inspection services related to the <br /> additional utilities work . <br /> A brief description of the scope of services and deliverables for Work Authorization #4 , <br /> Amendment #3 is provided below: <br /> Scope of Services <br /> Task C — Design and Construction Services <br /> Masteller & Moler, Inc . will provide revised Construction Plan Sheets and details necessary to <br /> support the construction of the reuse/sewer connection and sewer check valve assembly <br /> system . The connection and check assembly system facilitates the pumping of " non -spec" <br /> water from the Bent Pine RIB Site to the Central Wastewater Treatment Plant . This task shall <br /> include meetings with County Staff, the Contractor, revisions to the Construction Plans , and <br /> construction inspection services . <br />