Laserfiche WebLink
AMENDMENT #3 TO EXHIBIT # 1 <br /> 9/28/2009 <br /> Page 3 <br /> 2 . Florida Scrub Jay Survey <br /> A Florida Scrub Jay Survey will be completed based on guidelines set forth by the U . S . Fish and <br /> Wildlife Service ( USFWS ) and the Florida Fish and Wildlife Conservation Commission <br /> ( FFWCC ) . The survey will consist of a survey over a five-day period beginning one ( 1 ) hour <br /> after daylight , and terminating daily before mid -day . Call stations will be established at 200 <br /> meter intervals along the entire length of the easement . Within areas that are under public <br /> ownership adjacent to the easement , call stations will also be established at 50 meter and 100 <br /> meter intervals perpendicular to the easement. A recording of the scrub jay alarm call will be <br /> played in all four (4) directions at each station , based on USFWS survey protocol . Notes <br /> regarding scrub jay observations ( i . e . number observed , gender, flight patterns , other avian <br /> species identified , etc . ) will be recorded at each call station . Photos of each station will be taken <br /> to provide an overview of existing conditions . The survey will be completed when weather <br /> conditions are suitable , to provide optimal survey conditions . <br /> The methodology and results of the survey will be summarized in a narrative with accompanying <br /> map (s) . <br /> Additional Permitting <br /> The scope of services described above is based on FFWCCIs " 10 or fewer" Gopher Tortoise <br /> Permitting requirements . Should the on-site population exceed the standards for the " 10 or <br /> fewer" permit , an off-site relocation permit will be required . State fees as well as mitigation bank <br /> fees would be an additional cost should this alternative be required . Tortoise relocation and off- <br /> site relocation costs have not been included within this proposal . <br /> Since Florida Scrub Jay Permitting requirements will be determined by the Survey proposed <br /> above , fees associated with Scrub Jay permitting are not included . <br /> Additional gopher tortoise and scrub jay permitting , if necessary , will be described in a future <br /> Amendment . <br /> Y:Vnm\Projects\2006\0627\ADMIN\Contracts\AMENDMENT #3\0627_Exhibit 1 _Amen#3_09-0928.doc <br />