My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-227
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2016 11:42:03 AM
Creation date
10/1/2015 3:46:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/08/2009
Control Number
2009-227
Agenda Item Number
8.S.
Entity Name
Masteller,Moler,Reed and Taylor
Subject
Work Order No.11
CR512 Phase IV Roadway Improvements Final Right of Way Mapping Project
Area
CR 512
Project Number
9611B
Supplemental fields
SmeadsoftID
10763
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Work Order #11 <br /> County Road 512 Ph. 4 - R/W monumentation <br /> Page 2 of 9 <br /> 5. Set Permanent Reference Monuments along the Right of Way at all changes in <br /> direction , including all Points of Curvature and Tangency . Provide State Plane <br /> Coordinate values on all monumentation set . PRM ' s shall be an iron rod and disk <br /> stamped as agreed and encased in a 4" by 4" concrete monument and shall be <br /> placed at a maximum of 1000 feet apart . <br /> 6 . Set Permanent Reference Monuments along related project stormwater pond <br /> properties as applicable . PRM 's shall be an iron rod and disk stamped as agreed <br /> and encased in a 4" by 4" concrete monument and shall be placed at a maximum of <br /> 1 , 000 feet apart . <br /> 7. Monument all Permanent Control Points ( PCP's) along the baseline at all changes in <br /> direction , including all Points of Curvature and Tangency . Provide State Plane <br /> Coordinate values on all baseline control points . PCP 's shall be a Parker Kaylon nail <br /> and tab or a 4" by 4" concrete monument stamped as agreed and shall be placed at <br /> a maximum of 1 , 000 feet apart . <br /> 8 . Prepare Right of Way Map to depict all set or found monumentation and current title <br /> work as applicable . Map shall adhere to Indian River County Right of Way Map <br /> checklist. Provide copies for review and comment. <br /> 9 . Address comments and prepare mylars and other deliverables as required . <br /> 10 . Project (as a minimum ) shall adhere to attached Exhibit A " Proposal " and Right-of- <br /> Way Map "Checklist" Exhibit B . <br /> SECTION III — TIME FOR COMPLETION & DELIVERABLES/WORK PRODUCT <br /> 1 . Project shall be completed as follows . <br /> a. Time of 90% PRELIMINARY review submittal shall be 90 calendar Days from <br /> notice to proceed . <br /> b . Time of FINAL project completion shall be within 30 calendar days of receipt of <br /> the COUNTY review comments . <br /> 2 . Deliverables -The SURVEYOR shall provide the COUNTY : <br /> a . PRELIMINARY REVIEW . 90% product for COUNTY review and comments . One <br /> ( 1 ) paper "hardcopy" and DWF formatted digital file . COUNTY shall strive to <br /> provide review comments within 30 calendar days of preliminary submittal . <br /> b. FINAL two (2) paper " hardcopy" signed and sealed sets and one ( 1 ) signed and <br /> sealed MYLAR sets in adequate recording fashion ( I . E . Borders ) . Sheeted and <br /> model space ( as applicable ) AutoCad drawing file and PDF and DWF formats on <br /> CD . <br /> c. Survey set/sheets shall include a cover sheet with location sketch , survey <br /> certifications , and related title and project number ; a survey <br /> notes/legend/abbreviation sheet , survey horizontal control sheet(s ) , right-of- way <br /> plan view sheets and/or as indicated in the COUNTY supplied Right- of-Way map <br /> "checklist" . <br /> d . Work Product and digital versions are to prepared and submitted so that the <br /> COUNTY or other consultants can readily use it for the design and analysis of <br /> the area, as defined . It shall contain all information necessary for third-party <br /> surveyor to independently recreate and/or utilize the survey work . It is <br /> acknowledged all final products become property of COUNTY and will be <br /> available for use by the public at large . <br /> e . The SURVEYOR ' S work product shall meet or exceed the minimum standards <br /> as defined by Sections II , III and IV or the COUNTY will not approve the <br /> SURVEYOR' S request for payment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.