My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-270
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-270
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2016 1:08:41 PM
Creation date
9/30/2015 9:01:25 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
08/09/2005
Control Number
2005-270
Agenda Item Number
11.I.1
Entity Name
Nick Miller,Inc.
Subject
Work Order No.1 Services Master Agreement #0405
Area
Eastern Indian River Township
Project Number
0504
Supplemental fields
SmeadsoftID
5119
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 6 . <br /> Surveying and Mapping the Township (s) and interior sections of *jA <br /> Township 33E , Range 39S AND Township 32E , Range 39S . <br /> Work Order # 1 , rVen <br /> NICK MILLER , INC. <br /> EXHIBIT A <br /> Eastern Indian River County Township / Sectional Control <br /> Phase 2 (Townships 32 & 33 South , Range 39 East) <br /> Scope of Services , Fee Schedule <br /> man hour estimate <br /> Scope of Services : <br /> 1 . Obtain all pertinent Certified Corner Records , Government Land Office plats , field notes <br /> and Instructions to the Surveyor for the project area . <br /> 2 . Print available imagery to include DOQQ 's and Indian River County Property Appraiser <br /> digital orthophotos . <br /> 3 . Prepare overviews of the two townships within the project area to include preparation of <br /> an ArcGIS geodatabase , map exhibits and reports . The overviews will contain known <br /> information about individual section and quarter section corners . Mapping exhibits will <br /> also be delivered in AutoCAD format . <br /> 4 . Review each of the townships with the Indian River County Surveyor and update the <br /> township overviews based on comments and information received . <br /> 5 . Prepare a presentation outlining the benefits of the project to the local surveying <br /> community . Draft announcements and advertisements as needed . Arrange and conduct <br /> a forum with all willing local surveyors to discuss the project and their knowledge of <br /> section and quarter section corners within or pertinent to the project area . <br /> 6 . Perform field reconnaissance in the townships to determine the extent of existing <br /> monuments near the section and quarter section corner positions — approximately 235 <br /> locations . The extent of reconnaissance will be balanced based on the consultant's <br /> understanding of the relative importance of the corners involved . Thus , some searches <br /> may be very thorough while others are more or less cursory . <br /> 7 . References will be established for all found monuments and sketches will be prepared . <br /> Monuments will be positioned with a mapping grade ( 1 to 3 meter relative positioning , <br /> more or less ) GPS receiver for quick recovery and planning purposes . GPS survey <br /> observation diagrams will also be prepared at this time . <br /> 8 . Plan and execute a horizontal control survey using static GPS survey techniques to <br /> locate all monuments recovered during the field reconnaissance mission . The control <br /> survey will achieve a relative positional accuracy of 1 . 5 centimeters . <br /> 9 . Scan and link previously mapped Murphy Act deeds to existing GIS database . <br /> 10 . Update the geodatabase and township overview maps and reports based on the <br /> research , discussions , meetings , reconnaissance and observations outlined herein . <br /> 11 . Prepare a report summarizing the status of the section and quarter section corners . <br /> Status information to include , "found " , " missing " , physical characteristics of monuments , <br /> lineage and recommendations regarding acceptance and/or further investigation . <br /> >F :\Engineering\Capital Projects\0504 Township- Mapping Project Phase 2\Nick Miller contract\0504 Twp. 33-39 32-39 Nick Miller- IRC <br /> W0# 1 8-09-05 -mob.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.