Laserfiche WebLink
Task <br />Hourly Rate Components <br />4 lane/2 lane Roadway Transition <br />Geotechnical Investigation <br />Retention Pond Design <br />Phosphorus Mitigation <br />Landscape Details/Maintenance <br />Utility Location Survey <br />Utility Soft -dig Location Survey <br />(drainage design) (83 @ $450) <br />Utility Soft -dig Location Survey <br />(reuse/stub-outs) (77 @ $450) <br />MOT for Utility Soft -dig <br />(8 set-ups @ $2,000) <br />MOT for Utility Soft -dig <br />(6 set-ups @ $2,000 ea) <br />Special Signal Pole Design <br />Parcel Sketches & Legal Descriptions <br />Parcel Sketches & Legal Descriptions @ $600 <br />(original est. at 11 parcels) <br />Parcel Staking (10 @ $600.00) <br />Cure Plans <br />Pond/Property Site Surveys <br />Re -profiling Roadway due to Groundwater <br />Construction Phase Assistance <br />Sub -total <br />Grand Totals <br />Fee Fee <br />Amendment 4 Total Contract <br />$ 7,500.00 $ 15,000.00 <br />$ 0.00 $ 225760.00 <br />$ 0.00 $ 52,542.00 <br />$ 15020.00 $ 15020.00 <br />$ 0.00 $ 6,000.00 <br />$ 0.00 $ 12,000.00 <br />$ 0.00 $ 37,350.00 <br />$ 0.00 $ 34,650.00"' <br />$ 0.00 $ 163000.00 <br />$ 0.00 $ 12,000.001' <br />$ 0.00 $ 16,000.00 <br />$ 419250.00 $ 79,500.00 <br />$ 0.00 $ 65600.00 <br />$ <br />2,640.00 <br />$ <br />0.00 <br />$ <br />0.00 <br />$ <br />6,270.00 <br />$ <br />0.00 <br />i �f <br />$ <br />8,640.00 <br />$ <br />32,000.00 <br />$ <br />27,000.00 <br />$ <br />6,270.00 <br />$ <br />203000.00 <br />$ 4055332.00 <br />$1,3629201.00 <br />(1) This fee is provided for separately, as funding source is the responsibility of the COUNTY Utility Department. <br />When submitting invoices, this work effort will be indicated separately. <br />11 <br />