My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-053
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 2:30:35 PM
Creation date
9/30/2015 6:22:50 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT DELIVERABLES <br /> ELECTRONIC MAPS AND ATTRIBUTE DATABASES <br /> NMI will deliver the mapped reservations and releases in two electronic formats : <br /> 1 . AutoCAD 2000 blocks with attributes . <br /> 2 . ArcGIS polygon shape files with associated attribute tables . <br /> SURVEYOR' S REPORT <br /> NMI will prepare a report describing the methods used to create the maps and the spatial <br /> accuracy of the maps . <br /> PAPER MAPS <br /> In addition to the deliverables described above, the County may, at its option, authorize NMI to <br /> prepare two paper maps depicting the Murphy Act reservations and releases . <br /> 1 . A wall map showing state designated roads within Indian River County and highlighting <br /> the portions of those roads where reservations exist . <br /> 2 . A map book on 11 " x 17 " (tabloid) size paper showing approximately one Public Land <br /> Survey System Section per page . The map book will show the remaining reservations and <br /> will use the Property Appraiser ' s GIS map as a base map . <br /> DELIVERY SCHEDULE <br /> The project will consist of two submittals—a 10% complete submittal and a 100% complete <br /> submittal . At the 10% complete submittal the County will review the submitted maps within 21 <br /> working days and request any changes in the map or procedures . The purpose of this submittal is <br /> to ensure that the mapping is being prepared in a manner acceptable to the County and to <br /> incorporate any modifications to mapping methods at an early stage in the project . Significant <br /> modifications to the mapping methods outlined in this scope may alter the fee and delivery <br /> schedule . Following the final submittal, the County shall have 30 days to review the maps and <br /> make comments . NMI will then have 30 days to address the comments . <br /> 1 . Commence Work March 10, 2003 <br /> 2 . 10% Submittal May 2 , 2003 <br /> 3 . 100% Submittal September 22 , 2003 <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.