My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-134b
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-134b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 12:12:53 PM
Creation date
9/30/2015 8:38:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/19/2005
Control Number
2005-134B
Agenda Item Number
11.C.1
Entity Name
Donadio & Associates
Subject
Contract Conditions for Construction
Area
New County Administration Building
Supplemental fields
SmeadsoftID
4874
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 3.8 ALLOWANCES <br /> § 3.8.1 The Contractor shall include in the Contract Sum all allowances stated in the Contract Document . Items <br /> coveredby allowances shall be supplied for such amounts and by such persons or entities as the Owner nay direct, <br /> but the Contractor shall not be required to employ persons or entities to whom the Contractor has reasonable <br /> objection. <br /> § 3.8.2 Unless otherwise provided in the Contract Documents : <br /> .1 allowances shall cover the cost to the Contractor of materials and equipment delivered at the site and <br /> all required taxes, less applicable trade discounts; <br /> .2 Contractor's costs for unloading and handling at the site, labor, installation costs, overhead, profit and <br /> other expenses contemplated for stated allowance amounts shall be included in the Contract Sum but <br /> not in the allowances ; <br /> .3 whenever costs are more than or less than allowances, the Contract Sum shall be adjusted accordingly <br /> by Change Order. The amount of the Change Order shall reflect ( 1 ) the difference between actual <br /> costs and the allowances under Section 3 . 8 .2 . 1 and (2) changes in Contractor' s costs and other <br /> expenses under Section 3 . 8 . 2 .2 . <br /> § 3.8`.3 Materials and equipment under an allowance shall be selected by the Owner in sufficient time to $void delay <br /> in the Work. <br /> § 3.9 ' SUPERINTENDENT <br /> §>3.9. 1 The Contractor shallemploya competent superintendent and necessary assistants who shall be in attendance <br /> at the Project site during performance of the Work. The superintendent shall be satisfactory to the Owner. So lop <br /> as the- superintendent remains employed by the Contractor or any related entity, the su erintendent shall not be <br /> replaced 'without the Owner' s prior written consent. The superintendent shall represent the Contractor, d <br /> communications given to the superintendent shall be as binding as if given to the Contractor. Important <br /> communications shall be confirmed in writing. Other communications shall be similarly confirmed on written <br /> request in each case. ` ' <br /> § 3.10 CONTRACTOR'S CONSTRUCTION SCHEDULES <br /> § 3.10.1 The Contractor, promptly after being awarded the Contract, shall prepare and submit for the Owner' s and <br /> Architect' s'information 'a Contractor's construction schedule for the Work. The schedule shall not exceed time <br /> limits current under the Contract Documents, shall be revised at appropriate intervals as required by the conditions <br /> of the Work and Project, shall be related to the entire Project to the extent required by the Contract Documents, and <br /> shall provide for expeditious' and practicable execution of the Work. <br /> § 3.10.2 The Contractor shall prepare and keep current, for the Architect' s approval, a schedule of submit als which <br /> is coordinated ` with the Contractor' s construction schedule and allows the Architect reasonable time to re iew <br /> submittals . <br /> § 3.10.3 The Contractor shall perform the Work in general accordance with the most recent schedules su mitted to <br /> the Owner and Architect. <br /> § 3. 11 DOCUMENTS AND SAMPLES AT THE SITE <br /> § 3. 11 . 1 The Contractor shall maintain at the site for the Owner one record copy of the Drawings, Specifications, <br /> Addenda, Change Orders and other Modifications, in good order and marked currently to record field changes and <br /> selections made during construction, and one record copy of approved Shop Drawings, Product Data, Samples and <br /> similar required submittals . These shall be available to the Architect and shall be delivered to the Architect for <br /> submittal to the Owner upon completion of the Work. <br /> § 3.12 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES <br /> §' 3. 12.1 Shop Drawings are drawings, diagrams, schedules and other data specially prepared for the Wor) by the <br /> Contractor or a Subcontractor, Sub-subcontractor, manufacturer, supplier or distributor to illustrate some portion of <br /> the Work. <br /> AIA Document A201 TM - 1997. Copyright ® 1911 , 1915, 1918, 1925, 1937, 1951 , 1958, 1961 t 1963, 1966, 1967, 19709 19769 1987 and 1997 <br />by The <br /> American Institute of Architects. All rights reserved. WARNING: This AIAe Document Is protected by U.S. Copyright Law and Int rnational Treaties. <br /> � 5 <br /> Unauthorized reproduction or distribution of this AIA Document, or any portion of it, may result in severe civil and criminal penalties, and will <br />be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13 :00:02 on 04/19/2005 under Order <br /> No. 1000126313_1 which expires on 6/29/2005, and is not for resale. <br /> User Notes: (1205244124) <br /> U <br />
The URL can be used to link to this page
Your browser does not support the video tag.