9. 10.5 Acceptance of final payment b the Contractor, a Subcontractor Sub-subcontractor,P p Y Y b subcontractor <br /> and eguip ent or <br /> material supplier shall constitute a waiver of claims by that payee except those previously made in writ ng and <br /> identified by that payee as unsettled at the time of final Application for Payment. <br /> ARTICLE' 10 PROTECTION OF PERSONS AND PROPERTY <br /> § 10.1 SAFETY PRECAUTIONS AND PROGRAMS <br /> § 10.1 . 1 The Contractor shall be responsible for initiating, maintaining and supervising all safety precau ions and <br /> programs in connection with the performance of the Contract. <br /> §'--10.2 SAFETY OF PERSONS AND PROPERTY <br /> § 10.2. 1 The Contractor shall take reasonable precautions for safety of, and shall provide reasonable pro ection to <br /> prevent damage, injury or loss to : <br /> A employees on the Work and other persons who may be affected thereby ; <br /> .2 the Work and materials and equipment to be incorporated therein, whether in storage on r off the <br /> site, under care, custody or control of the Contractor or the Contractor' s Subcontractors r Sub- <br /> subcontractors; and <br /> .3 other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements, <br /> roadways, structures and utilities not designated for removal , relocation or replacement in the course <br /> of construction! <br /> § 10.2.2 The Contractor shall give notices and comply with applicable laws, ordinances, rules, regulatior s and lawful <br /> orders of public authorities bearing on safety of persons or property or their protection from damage, injury or loss. <br /> § 10.2.3 The Contractor shall erect and maintain, as required by existing conditions and performance of eContract, <br /> reasonable safeguards for safety and protection, including posting danger signs and other warnings agai st hazards, <br /> promulgating safety regulations and notifying owners and users of adjacent sites and utilities. <br /> § 10.2.4 When use or storage of explosives or other hazardous materials or equipment or unusual metho s are <br /> necessary for execution of the Work, the Contractor shall exercise utmost care and carry on such activiti s under <br /> supervisionof properly qualified personnel. <br /> § 10.2.5 The Contractor shall promptly remedy damage and loss (other than damage or loss insured under property <br /> insurance required by the Contract Documents) to property referred to in Sections 10.2. 1 .2 and 10. 2 . 1 . 3 mused in <br /> whole or in part by the Contractor, a 'Subcontractor, a Sub-subcontractor, or anyone directly or indirectI3 employed <br /> by any of them, or by anyone for whose acts they may be liable and for which the Contractor is responsi Me under <br /> Sections 10.2. 1 .2 and 10.2. 1.3, except damage or loss attributable to acts or omissions of the Owner or Architect or <br /> anyone directly or indirectly employed by either of them, or by anyone for whose acts either of them may be liable, <br /> and not attributable to the fault or negligence of the Contractor. The foregoing obligations of the Contractor are in <br /> addition to the Contractor' s obligations under Section 3 . 18 . <br /> § 10.2.6 The Contractor shall 'designate a responsible member of the Contractor' s organization at the site whose duty <br /> shall be the prevention of accidents. This person shall be the Contractor' s superintendent unless otherwi e <br /> designated by the Contractor in writing to the Owner and Architect. <br /> §' 10.2.7 The Contractor shall not load or permit any part of the construction or site to be loaded so as to endanger its <br /> safety. <br /> § 10.3 HAZARDOUS MATERIALS <br /> § 10.3. 1 If reasonable precautions will be inadequate to prevent foreseeable bodily injury or death to persons <br /> resulting from a material or substance , including but not limited to asbestos or polychlorinated biphenyl I[PCB ), <br /> encountered on the site by the Contractor, the Contractor shall, upon recognizing the condition, immedialely stop <br /> any ongoing Work in the affected area and report the condition to the Owner and Architect in writing . <br /> § 10.3.2 The Owner shall obtain the services of a licensed laboratory to verify the presence or absence of �he material <br /> or substance reported by the Contractor and, in the event such material or substance is found to be preset, to verify <br /> that it has been rendered harmless . Unless otherwise required by the Contract Documents, the Owner shall furnish in <br /> writing to the Contractor and Architect the names and qualifications of persons or entities who are to perform tests <br /> AIA Document A201TIR - 1997. Copyright ® 1911 , 19152 1918, 1925, 1937, 19519 19580 1961 , 1963, 1966, 1967, 1970, 1976, 1987 a d 1997 <br /> by The <br /> American Institute of Architects. All rights reserved. WARNING: This AIAs Document is protected by U.S. Copyright Law and International Treaties. <br /> 33 <br /> Unauthorized reproduction or distribution of this AIA! Document, or any portion of it, may result In severe civil and criminal penalties, and will be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13 :00:02 on 04/19/2005 under Order <br /> No. 1000126313_1 which expires on 6/29/2005, and is not for resale. <br /> User Notes: (1205244124) <br />