i
<br /> 1
<br /> 3 . 3 .2 3 ,4. 31 3 , 8 , 19 3 .9 3 . 18 .29 4.2 .39 4 .2, 69 10.2 10. 3 6 . 2.5 3. 14
<br /> 11 . 1 . 1 , 11 .4.71 14. 11 14. 2. 1 . 1 , Damage to Construction of Owner or Sep ate
<br /> Contractor' s Liability Insurance Contractors
<br /> 11 . 1 3 . 14 .29 6 .2.49 9.2. 1 . 59 10.2 . 1 .21 10.2 .51 10 63 11 . 1 ,
<br /> Contractor' s Relationship with Separate Contractors 11 .4, 12.2.4
<br /> and Owner' s Forces Damage to the Work
<br /> 3 . 12.51 3 . 14.29 4.2.49 61 11 .4.77 12 . 1 .29 12.2 .4 3 . 14.21 9 .9 . 19 10.2 . 1 .2, 10.2.51 10.67 11 .41 12.2 .4
<br /> Contractor' s Relationship with Subcontractors Damages, Claims for
<br /> 1 .2.293 . 3 . 293 . 18 . 1 , 3 . 18 . 21599 .6 .2, 9 .6.719 . 10.21 3 .2.313 . 18, 4. 3 . 1096. 1 . 118 .3 . 379 .5 . 119 .67110. 3 .39
<br /> 11 .4. 1 .29 11 .43 , 11 .4. 8 ` 11 . 1 . 11 11 .4 .57 11 ,43114, 13 ? 14. 2 .4
<br /> Contractor' s Relationship with the Architect Damages for Delay
<br /> 1 . 1 .2, 1 .69 3. 139 3 .2. 1; 3.2;2, 3 .2.3 , 3 .3 . 19 3 .4.29 3 .5 . 19 6 . 1 . 19 8 .3 . 39 9.5 . 1 .69 9.79 10.3 .2
<br /> 3 .7 .31 3 . 10, 3 .11 , 3 . 129 3.169 3 . 189 4. 1 .21 4. 1 .39 4 . 29 Date of Commencement of the Work, Definition of
<br /> 4.3 .49 4.4. 1 , 4:4.7, 5 .21 6: 2. 29 79 8 . 3 . 1 , 9 .2, 9. 3 , 9.41 8 . 1 .2
<br /> 9 ,5s 9 .79 9. 8, 9:99 10.2.69 10.3 , 11 .39 11 .4.71 12, Date of Substantial Completion, Definition of
<br /> 13 .4.22 13.5 8 . 1 .3
<br /> Contractor's Representations Day, Definition of
<br /> 1 .5 .21 3 .5 . 11 3 . 12,69 6 . 2 .21 8.2. 1 , 9. 3 .39 9. 8 .2 8 . 1 .4
<br /> Contractor' s Responsibility for Those Performing the Decisions of the Architect
<br /> Work 4 .2. 67 4.2.71 4.2. 11 , 4.2 . 122 4. 2. 13 , 4. 3 .4, .4. 1 , 4 .4.5 ,
<br /> 3.3 .21 3 . 18 , 4.2.31 4.3; 8, 5 .3. 1 , 6 . 1 .39 6 .27 6. 37 9 .5 . 1 , 4.4. 61 4.59 6 .37 7 .3 .62 7 .3 . 8 ; 8 . 1 . 39 8 .3 . 19
<br /> 9 . 2 , 9 .49
<br /> 10 9 . 5 . 19 9 . 8 .4, 9 .9 . 11 13 .5 .21 14 .2. 29 14 .2.4
<br /> Contractor' s Review of Contract Documents Decisions to Withhold Certification
<br /> 1 .5 .21 3 .29 3 .7 .3 9 .4. 19 9.5, 9 .79 14 . 1 . 1 .3
<br /> Contractor' s Right to Stop the Work Defective or Nonconforming Work, Acce tance,
<br /> 9. 7 Rejection and Correction of
<br /> Contractor' s Right to Terminate the Contract 2 . 37 2.47 3 .5 . 1 , 4.2 .62 6.2. 57 9 . 5 . 11 9 .5 .21 9. .6, 9 . 8 . 21
<br /> 4. 3 . 10, 14. 1 9 .9. 399. 10.4112 .2. 1 , 13 .7 . 1 .3
<br /> Contractor' s Submittals Defective Work, Definition of
<br /> 3 . 109 3 . 119 3 . 12, 4.2.7, '5 .2. 1 , 5 .2 .39 7 .3 .6, 9.21 9.31 3 .5 . 1
<br /> 9. 8:27 9. 8 .3 , 9.9 . 1 , 9. 10.2, 9 . 10.3 , 11 . 1 .3 , 11 .5 .2 Definitions
<br /> Contractor' s Superintendent 1 . 11 2. 1 . 11 3 . 11 3 .5 . 1 , 3 . 12 . 12 3 . 12.2, 3 . 12 . 11 4. 1 . 12
<br /> 3 ,99 10.2.6 4. 3 . 1 , 5 . 1 , 6. 1 . 2, 7 .2. 1 , 7.3 . 197. 3 . 698 . 11 91 , 9.8 . 1
<br /> Contractor' s Supervision and Construction Delays and Extensions of Time
<br /> Procedures 3 . 2. 31 4.3 . 19 4.3 .4, 4.3 .71 4.4.5 , 5 .2 .3 , 72, 11 7 . 3 . 1 ,
<br /> 1 .2 .213 .373.413 . 12, 1094.2.294. 2 .794. 3 .396. 1 .37 7 .4. 198.379.5 . 1 , 9 .7 . 19 10. 3 .2, 10.6. 11 14. .2
<br /> 6.2 .41 7 . 1 .31 73`.4, 7 .3 .69 8 .29 10, 12, 14 Disputes
<br /> Contractual Liability Insurance 4. 1 .41 4.3 , 4.41 4.59 4.61 6.39 7 .3 . 8
<br /> 11 . 1 . 1 . 8, 11 .2, 11 .3 Documents and Samples at the Site
<br /> Coordination and Correlation 3. 11
<br /> 1 .29 1.5.29 3 .3 . 17 3 . 107 3 . 12 .61 6. 1 .39 6.2. 1 Drawings, Definition of
<br /> Copies Furnished of Drawings and Specifications 1 . 1 . 5
<br /> 1 . 61 2 .2 . 59 3 . 11 Drawings and Specifications, Use and Owlnership of
<br /> Copyrights 1 . 1 . 1 , 1 .37 2.2.5 , 3 . 119 5 .3
<br /> 1 . 6, 3 . 17 Effective Date of Insurance
<br /> Correction of Work 8 .2.2, 11 . 1 .2
<br /> 2. 39 2.4, 3 .7 .4, 4.2, 11 9.4. 2, 9. 8 .2, 9 . 8 . 37 9 .9 . 11 12 . 1 .27 Emergencies
<br /> 12 .2, 13 .7 . 1 .3 4. 3 .5 , 10.6, 14. 1 . 1 .2
<br /> Correlation and Intent of the Contract Documents Employees, Contractor' s
<br /> 1 .2 3 . 3 .2, 3 .4. 39 3 . 8 . 1 , 3 .97 3 . 18 .21 4 .2 .39 4. 2.6 10.29 10.3 ,
<br /> Cost, Definition of 11 . 1 . 19 11 .4.79 14 . 11 14. 2 . 1 . 1
<br /> 7. 3 .6 Equipment, Labor, Materials and
<br /> Costs 1 . 1 . 3 , 1 . 1 . 67 3 .49 3 .5 . 17 3 . 8 .29 3 . 8 . 3 , 3 . 129 3 13 , 3 . 15 . 1 ,
<br /> 2.41 3 .2 . 31 3 .7 .4, 3 . 8 .29 3 . 15 .29 4.31 5 .4.29 6 . 1 . 11 6 . 2.31 4. 2 . 69 4.2. 73 5 .2 . 17 6 .2 . 1 , 7 .3 . 6, 9 . 3 .21
<br /> 9 .3 . , 9.5 . 1 . 3 ,
<br /> 7 .3 .3 .3 , 7. 3 .69 7 .3 .7 , 7 . 3 . 8 , 9. 10. 29 10. 3 .2 , 10.5 , 11 .3 , 9 . 10.2, 10.2 . 1 , 10.2.4, 14. 2. 1 .2
<br /> 11 .4, 12 . 1 , 12.2. 12 12 . 2 .4, 13 .59 14 Execution and Progress of the Work
<br /> Cutting and Patching
<br /> AIA Document A201 TM - 1997. Copyright © 1911 , 1915, 1918, 1925, 1937, 1951 , 1958, 1961 , 1963, 1966, 1967, 19709 1976, 1987 ai d 1997
<br /> by The
<br /> American Institute of Architects. All rights reserved. WARNING : This AIA® Document Is protected by U.S. Copyright Law and Int rnational Treaties.
<br /> Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal p nalties, and will
<br /> be 4
<br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13 :00:02 on 04/19/200 5 under Order
<br /> No. 1000126313_1 which expires on 6/29/2005, and is not for resale.
<br /> User Notes: (1205244124)
<br />
|