T <br /> Document G701TM <br /> I - 2001 <br /> Change Order <br /> PROJECT (Name and address): CHANGE ORDER NUMBER: 035 OWNER: <br /> New County Administration Building DATE: January 15 , 2008 ARCHITECT: <br /> Lying Between the Main Relief Canal to <br /> the North, the Lateral D Canal on the CONTRACTOR: <br /> Sounth and East and 20th Avenue to the <br /> West FIELD: ❑ <br /> TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 2102 OTHER: ❑ <br /> Turner Construction Company CONTRACT DATE: ( Amendment # 2) August 23, 2005 <br /> 800 N. Magnolia Avenue CONTRACT FOR: Guaranteed Maximum Price - <br /> Orlando, Florida 32803 Construction Manager at Risk <br /> THE CONTRACT IS CHANGED AS FOLLOWS: <br /> (Include, where applicable, any undisputed amount attributable m previously executed Construction Change Directives) <br /> COR 116 Description Amount <br /> PCO No. 032 <br /> Item 001 Release Hold Allowance for Brick Pavers and Sidewalks $23,778 <br /> 002 Remove Temporary Sidewalks, add fill and sod replacement ($4,553) <br /> 003 Remove Existing Pedestian Ramp/Curb cut & repalce with new curb ($ 477) <br /> 004 Fumish and install Detectable Warning Stripsat Bldgs I & 2 <br /> Total area of approximately 280 sq. ft. ($7,000) <br /> 005 Provide decorative stone flumes at base of open downspouts ($2,500) <br /> 010 Increase Owners Contingency - Paver Allowance Adjustment $9,248 <br /> The above actions will not change the GMP, but will increase the Owner' s Contingency by $9,248. <br /> The original Guaranteed Maximum Price was $ 33,086,442.00 <br /> The net change by previously authorized Change Orders $ (5,263,677.00) <br /> The Guaranteed Maximum Price prior to this Change Order was $ 27,822,765.00 <br /> The Guaranteed Maximum Price will be changed by this Change Order in the amount of $ 0 <br /> The new Guaranteed Maximum Price including this Change Order will be $ 27,822,765.00 <br /> The Contract Time will be increased by zero 10 ) days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is August 3, 2007. <br /> NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which <br /> have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br /> Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br /> NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br /> Donadio & Associates, Architects, P.A. Turner Construction Company Indian River County Board of County <br /> Commissioners <br /> ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) <br /> 609 17th Street, Vero Beach, Florida 800 N. Magnolia Avenue, Orlando, FL 1901 27th Street. Vero. Beach,Florida <br /> 32960 32803 32960 - -. <br /> S ADDRE�) AD SS <br /> BY (Signature) (q ydn U f.3BY `SflignAu BY ( ilmatare) <br /> Anthony Donadio Louis Fiore Sandra L. .Bowden, Chairman . <br /> (Typed name) (Typed name) (Typed dameti <br /> DATE DATE DATE y -DATE <br /> AIA Document G701 TO — 2001 . Copyright © 1979, 1987. 2000 and 2001 by The Amencan Institute of Architects. All rights <br /> reserved. W <br /> Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA' Document, or any <br /> portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the laly_ATI1is d�cu1�erl( O08 <br /> was produced by AIA software at 13:13:44 on 01110/2008 under Order No.1000313134 1 which expires on 7/24/2008, and is not for resaleJ]AIY j <br /> User Notes: ( 16593439 <br /> TURNE �2 <br />