My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-137
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 11:06:06 AM
Creation date
9/30/2015 10:44:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/17/2007
Control Number
2007-137
Agenda Item Number
11.C.1
Entity Name
Turner Construction
Subject
Change Order 027
Area
County Administration Building 1801 27th St.
Supplemental fields
SmeadsoftID
6265
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River Co. Approved Date <br /> ® Administration <br /> Legal <br /> IA Document G701TM — 2001 DBudget— <br /> epartment <br /> Risk Mana ment <br /> Change Order <br /> PROJECT (Name and address): CHANGE ORDER NUMBER: 077 OWNER: <br /> New County Administration Building DATE: April 17, 2007 ARCHITECT: <br /> Lying Between the Main Relief Canal to <br /> Ej <br /> the North, the Lateral D Canal on the CONTRACTOR: <br /> Sounth and East and 20th Avenue to the <br /> West FIELD: ❑ <br /> TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 2102 OTHER: ❑ <br /> Turner Construction Company CONTRACT DATE: (Amendment # 2) August 23, 2005 <br /> 800 N. Magnolia Avenue CONTRACT FOR: Guaranteed Maximum Price - <br /> Orlando, Florida 32803 Construction Manager at Risk <br /> THE CONTRACT IS CHANGED AS FOLLOWS: <br /> (Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) <br /> Reference Description Amount <br /> SECTION I <br /> COR 091 Modifications to Building 2 for New Conference Room and CCD-021/PCO 103-Conference <br /> Room 2. 1 -501, Production 1 .2-704 & Computer Room L2-302 <br /> & Computer Room 1 .2-302 585, 134 <br /> COR 093 Modify Scope of Existing Manhole Extensions per CCD-01 1 $ 19,438 <br /> COR 095 Modify Revise Elevator Machine Rooms to Meet Revised Codes CCD-021 and CCD-026 $42.511 <br /> COR 096 Architecture] Revisions and Miscellaneous Carpet Revisions. $44,071 <br /> COR 097 Modify Drainage at Bridge Approach at East End of 27th St. $ 14, 102 <br /> COR 102 Revise Design in Commission Chambers. $26,640 <br /> COR 103 Miscellaneous Site Revisions and Expedite Fixture Delivery $ 12,522 <br /> Total $244,418 <br /> Approval of this SECTION I of this Change Order will not change the GMP but will decrease the Owner's <br /> Contingency by $244,418. <br /> SECTION 2 <br /> ADDITIONAL COSTS : <br /> Modifications to Electrical, Data and Communications Systems to accommodate Owner Requirements for new <br /> configurations resulting from installation of furnishings, more refined IT power sources, and support infrastructure <br /> for Audio Visual systems. $841 .588 <br /> Other known additional cost items which are not-to-exceed expenses but which are well scoped include the following: <br /> Add sidewalk and steps. $ 32 ,000 <br /> Revise Atrium Drywall and Koral Kast $ 10,000 <br /> Add Coaxial Cable System for Cable TV $ 85,000 <br /> Misc. Interior Revisions $ 25,000 <br /> Misc. Exterior Revisions $ 25,000 <br /> Subtotal $ 177,000 <br /> Approval of this SECTION 2 of this Change Order will increase the GMP by $956,661 and will decrease the Owner' s <br /> Contingency by $61 ,927. <br /> Grand Total $ 1 ,263,006 <br /> The original Guaranteed Maximum Price was $ 33.086,442.00 <br /> The net change by previously authorized Change Orders $ (6. 190,487.00) <br /> The Guaranteed Maximum Price prior to this Change Order was <br /> $ 26,895955 .00 <br /> The Guaranteed Maximum Price will be increased by this Change Order in the amount of $ 956,661 .00 <br /> The new Guaranteed Maximum Price including this Change Order will be $ 27,852,616.00 <br /> The Contract Time will be increased/decreased by zero ( 0 ) days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is June 30, 2007. <br /> AIA Document G701 TM - 2001 . Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA" <br /> Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this Ale Document, or any � <br /> portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document <br /> was produced by AIA software at 14:20 :01 on 04/11 /2007 under Order No. 1000250302_I which expires on 7/25/2007, and is not for resale. <br /> User Notes: <br /> (4165883699) <br />
The URL can be used to link to this page
Your browser does not support the video tag.