My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-137C
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-137C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 11:30:48 AM
Creation date
9/30/2015 10:45:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/17/2007
Control Number
2007-137C
Agenda Item Number
11.C.1
Entity Name
Turner Construction
Subject
Change Order No.COR-095
Area
County Administration Building 1801 27th St.
Project Number
11531
Supplemental fields
SmeadsoftID
6268
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Turner <br /> March 12 , 2007 <br /> Mr. Steve Blum <br /> Project Manager <br /> Indian River County Administration Complex <br /> 2625 19th Avenue <br /> Vero Beach, FL 32960 <br /> RE : IRC New Admin Building <br /> 2625 19th Avenue <br /> Vero Beach , Florida 32960 <br /> Project #: 11531 <br /> Change Order Request Number COR-095 <br /> Scope Change <br /> Dear Mr. Blum, <br /> We have finalized gathering all the required quotations for PCO-109 for the following extra work: CCD-021 (Partial) & <br /> CCD-26: Revise Elevator Machine Room to meet Revised Codes We have reviewed the Subcontractor <br /> Proposals (copies attached hereto) and have verified that all extra work items are in compliance with our Contract <br /> Agreement. The following is a detailed itemization of all extra costs: <br /> PCO No Item No Description Amount Contractor <br /> 109 001 Add rated Drywall Ceilings in Elevator Machine $2,264. ACOENG <br /> Rooms per CCD #$21 . <br /> 109 002 Prepare and patch drywall ceiling for CoolCube $ 1 ,000. Turner Estimate <br /> Ductwork <br /> 109 003 Touch up and repaint in Elevator Machine Rooms $500. Turner Estimate <br /> 109 004 Add Cool Cube Air Conditioning Units for Elevator $22,997. COAMEC <br /> Machine Rooms per CCD #21 revised. <br /> 109 005 Revise electrical power for Elevator Machine $ 10 ,243. MILELE <br /> Rooms per CCD #21 . <br /> 109 006 General Conditions @ 10% $32700 . TURCON <br /> 109 007 Fee @4.25% of Total. $ 1 ,807. TURCON <br /> Total Change to the GMP: $42,511 . 00 <br /> This change results in a schedule impact of 60 days to the Project. The Extension of Time is included in COR 094 <br /> and is concurrent with other CDR's as referenced in COR-094. <br />
The URL can be used to link to this page
Your browser does not support the video tag.