Act Activity Orig Months <br /> ID Description Dur _7 1 2 3 4 5 6 7 8 91 10 1 11 12 13 1 14 1 15 <br /> 16 17 18 <br /> B2076 Lower Rf - Mansard Barrel Tile & Gutters 11 ®Lower Rf - Mansard Barrel Tile & Gutters <br /> B2080 Lath & Stucco (incl molded crown & trim) 35 Lath & Stucco (incl molded crown & trim) <br /> B2084 Standing Seam Roof 11 ®Standing Seam Roof- incl peel & stick wtrproof membrane <br /> B2088 Window / Storefront & Ext. Doors 21 Window / Storefront & Ext. Doors <br /> B2092 Exterior Paint 18 ®Exterior Paint <br /> Interior / Finishes <br /> 82096 MEP/FS Risers (Vents, Stacks, Fdrs, RWLs) 18 MEP/FS Risers (Vents, Stacks, Fdrs, RWLs) <br /> 82100 Plumbing Rough-in (incl water piping & insul) 25 Plumbing Rough-in (incl water piping & insul)CW, HW, Dom , 1VW, <br /> etc. <br /> B2104 HVAC Rough-in (Ductwork, Insulation) 49 HVAC Rough-in (Ductwork, Insulation) incls Set AHUs <br /> B2108 Elect Pwr/Ltg/FA/Systems Rough-in 49 Elect Pwr/Ltg/FA/Systems Rough-in Walls/Ceilings <br /> B2112 Fire Sprinkler Rough-in & Pressure Test 35 Fire Sprinkler Rough-in & Pressure Test <br /> 82116 HMtI Dr Frames, Mtl Stud Walls, Soffits, Ceil'gs 35 HMtl Dr Frames, Mtl Stud Walls, Soffits, Ceil'gs <br /> 82120 Install Hydraulic Elevators, Finish, Inspections 39 ®Install Hydraulic Elevators, Finish , Inspections <br /> B2124 Drywall, Tape & Finish Walls, Soffits & Ceilings 35 ®Drywall, Tape & Finish Walls, Soffits & Ceiling <br /> B2128 Main Stair & Balconys - Stru , Railings, Finish 35 ®Main Stair & Balconys - Stru, Railings Finish <br /> 82132 Controls - Wiring , Devices, Test & Check-out 25 —Controls - Wiring, Devices, Test & Check-ou <br /> 82136 1 st Coat & Prime Paint 28 ® 1 st Coat & Prime Paint <br /> 82140 Ceiling Grid 21 Ceiling Grid <br /> 82144 Drops, Diffusers in Ceil'g Grid 21 Drops, Diffusers in Ceil 'g Grid <br /> B2148 Light Fixutres in Ceilg Grid 21 I®Light Fixutres in Ceilg Grid <br /> 82152 Instl Fire Alarm Devices / Exit Signs 18 I—Instl Fire Alarm Devices / Exit Signs <br /> 82156 Fire Sprinkler Cut Drops & Instl Spr Heads 14 ®Fire Sprinkler Cut Drops & Instl Spr Head <br /> B2160 Instl Acoustic Ceiling Tile 14 ®Inst) Acoustic Ceiling Tile N <br /> 82164 Start-up AC - Run Air 0 ® Start-up AC - Run Air A <br /> B2168 Hang Doors & Install Hardware 11 ®Hang Doors & Install Hardware <br /> 82172 Interior Glass & Glazing 7 Olnterior Glass & Glazing <br /> 82176 Test & Balance HVAC 11 ®Test & Balance HVAC <br /> B2180 Millwork- Cabinets, Arch Wdwk, Shelving, Ctrtops 14 ®Millwork- Cabinets, Arch Wdwk, I helving, Ctrtops <br /> 82184 Finish Paint 14 ®Finish Paint <br /> 82188 Floor Tile & Base 21 t Floor Tile & Base <br /> B2192 MEP/FS Trim-out 14 t MEP/FS Trim-out <br /> 82196 VCT, Carpet & Base 14 NEWCT, Carpet & Base <br /> B2200 Misc Furnishings 11 ®Misc Furnishings <br /> B2204 Misc Specialties 11 ®Misc Specialties <br /> B2208 GC Clean (sub punch) 11 ®GC Clean (sub punch) <br /> 82212 Restrooms - Tile 21 ®Restrooms - Tile <br /> 82216 Restrooms - Vanities & Countertops 4 ■Restrooms - Vanities & Countertops <br /> B2220 Restrooms - Plumbing Fixtures 14 1®Restrooms - Plumbing Fixtures <br /> B2224 Restrooms - Toilet Partitions & Accessories 7 MRestrooms - Toilet Partitions Accessories <br /> Run Date 26MAY0507:38 IROATurner Construction CompanySheet 4 of 4 It01 Project Schedule <br /> Finish Date 08DEC06 <br /> Data Date 11APR05 Indian River County Administration Facility <br /> © Primavera Systems , Inc. GMP Summary Schedule <br />