Laserfiche WebLink
ORIGIN ell <br /> 42001- 141 - Io � o ? <br /> Indian River Co. Approved Date <br /> Administration <br /> AIA Legal <br /> A'� Document G701T" — 2001 Budget <br /> Department <br /> Risk Managment <br /> Change Order <br /> PROJECT (Name and address): CHANGE ORDER NUMBER: 026 OWNER: <br /> New County Administration Building DATE: April 10, 2007 ARCHITECT: <br /> Lying Between the Main Relief Canal to <br /> the North, the Lateral D Canal on the CONTRACTOR: <br /> Sounth and East and 20th Avenue to the <br /> West <br /> FIELD: ❑ <br /> TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 2102 OTHER: ❑ <br /> Turner Construction Company CONTRACT DATE: (Amendment # 2) August 23, 2005 <br /> 800 N. Magnolia Avenue CONTRACT FOR: Guaranteed Maximum Price - <br /> Orlando. Florida 32803 Construction Manager at Risk <br /> THE CONTRACT IS CHANGED AS FOLLOWS: <br /> (Include, where applicable, any undisputed amount attributable to previocWy wended Construction Change Directives) <br /> Reference Description Amount <br /> COR 098 CCD # 15 - Water Meter size reduction, backflow preventer pipe size <br /> and location modification. ($ 1 ,970.00) credit <br /> COR 099 Replace abuse-resistant drywall and above ceiling perimeter drywall <br /> board with comer guards. ($2,774.00) credit <br /> The acceptance of this change item will not change the GMP, but will increase the Owner' s Contingency by $4,744 <br /> The original Guaranteed Maximum Price was $ 33,086.442 .00 <br /> The net change by previously authorized Change Orders $ (6, 190,487 .00) <br /> The Guaranteed Maximum Price prior to this Change Order was $ 26.895,955 .00 <br /> The Guaranteed Maximum Price will be decreased by this Change Order in the amount of $ 0 <br /> The new Guaranteed Maximum Price including this Change Order will be $ 26,895,955 .00 <br /> The Contract Time will be increased/decreased by zero 10 ) days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is lune 30, 2007. <br /> NOTE : This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which <br /> have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br /> Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br /> NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br /> Donadio & Associates, Architects, P.A. Turner Construction Company Indian River�Coanitj•'Bgard of Count), <br /> Commissioners P- <br /> ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Finn name) <br /> 609 17th Street, Vero Beach, Florida 800 N. Magnolia Avenue, Orlando, FL = 1840 25Th Street, Vero Beach,Florida <br /> 32960 32803 .32960 - - <br /> A ESS AD SS <br /> Val a ature) BY ignature) YfStgrt'dttY <br /> Anthony Donadio Loui Gary C. Wheeler, Chairman <br /> (Typed name) (Typed name) (Typed none) <br /> DAT z' DATE DATE <br /> AIA Document G701 ^" - 2001 . Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA° <br /> Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this Al a Document, or any <br /> portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document <br /> was produced by AIA software at 10.03:19 on 04/04,2007 under Order No. 1000250302_1 which expires on 7%25,2007, and is not for resale. <br /> User Notes: (1 4 1 0 5401 21 ) <br />