My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-263B
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-263B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:52:07 AM
Creation date
9/30/2015 11:02:44 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 _ a � 8 <br /> D O N A D I O <br /> & Associates, Architects. P.A . <br /> TO: LOU FIORE TURNER CONSTRUCTION <br /> STEVE BLUM INDIAN RIVER COUNTY <br /> LYNN WILLIAMS INDIAN RIVER COUNTY <br /> TOM FRAME INDIAN RIVER COUNTY <br /> JIM LEVERONI DONADIO AND ASSOCIATES <br /> FROM: ANTHONY J, DONADIO, AIA, NCARB <br /> DONADIO & ASSOCIATES, ARCHITECTS, P.A. <br /> DATE: TUESDAY - JULY 179 2007 & THURSDAY - JULY 19, 2007 <br /> ISSUE DATE: THURSDAY - JULY 269 2007 <br /> PROJECT NO, 2102,18 <br /> REGARDING: INDIAN RIVER COUNTY ADMINISTRATIVE COMPLEX <br /> BUILDING 1 - 2ND FLOOR - WEST - PUNCH LIST <br /> TIME: 2: OOPM <br /> WEATHER: SUNNY / HOT /HUMID <br /> Atrium 2-101 <br /> 1 . Not yet ready to be Punch Listed. <br /> Vestibule 2-102 <br /> 1 . Access panel above drinking fountains need to be installed . <br /> 2. Drinking fountains needs to be re-caulked around the perimeter. <br /> 3 . Drywall ceiling needs to be sanded and repainted wedges in the drywall finish, unacceptable. <br /> 4. Top outside edge of Vestibule 2- 102 needs to be sanded and repainted, very rough and irregular. <br /> 5 . Outside corners of vinyl base need to be pulled tight together where ever they occur. <br /> 6. Right side of Door I11 leading to Men ' s Restroom vinyl base cut edge is exposed and should be hidden by <br /> the edges of the hollow metal frame. <br /> Conference Room 2-105 <br /> 1 . Door 2- 105 outside face top above the view light, chip in the finish <br /> 2. Perimeter of view light metal frame word finish needs to be cleaned of paint. That is also true on the inside. <br /> 3 . Inside face bottom left comer and bottom edge of Door 2- 105 finish is damaged. <br /> 4. Right side of hollow metal frame 2- 105 needs to be repainted. <br /> 5 . Light switches to the left of 2-105 need to b e set plumb and level . <br /> 6. Six can lights not operating at this time . <br /> 60917 1h Street Vero Beach, Florida 32960 Phone 772794 2929 Fax 772 562 8600 <br /> Email daa@donadio-arch.com License No. AA0002238 <br />
The URL can be used to link to this page
Your browser does not support the video tag.