My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-263C
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-263C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:53:37 AM
Creation date
9/30/2015 11:02:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
08/20/2007
Control Number
2007-263C
Agenda Item Number
County Administer signature
Entity Name
Donadio & Associates
Subject
Punch List Buiilding 2 - 2nd Floor - East End
Area
New County Administration Building
Supplemental fields
SmeadsoftID
6491
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Administration Complex <br /> ' Bldg. 1 — 2nd Floor East End Punchlist — Friday 04/06/07 <br /> April 16, 2007 <br /> Page 2 <br /> Open Office Area 1.2-202 (continued) <br /> 6. Right outside corner of Door 230B alcove corner bead is damaged. Also on the left hand side same thing, <br /> scratch in the drywall . <br /> 7 . Right side of doorjamb 230B drywall is very irregular, needs to be sanded and repainted. That is true of the <br /> left side of the vinyl base location and the right corner. <br /> 8 . Vinyl base not installed on the west wall of Storage Room 229 from door 230B towards the Men' s & <br /> Women ' s Restroom. <br /> 9. Same wall gauges in the drywall have been painted, the vinyl base area needs to be patched and repaired. <br /> 10. North wall opposite the drinking fountains, pencil marks on the wall need to be repainted. Also, the west <br /> comer of this north wall is damaged, needs to be patched and repaired. <br /> 11 . Work still going on in this area. . Carpet boxes all over the floor and also, news print paper on the carpet for <br /> protection. <br /> 12. South face of the wall directly opposite the drinking fountains needs to be patched and repaired. Paints not <br /> matching where it has been touched up. <br /> 13 . North drywall wall of open Office area, the wall conjunction with File Room 207, right end paint on top of <br /> the vinyl base needs to be removed. Also, on this same wall pencil marks on the wall need to be cleaned and <br /> repainted. <br /> 14. Drywall to the right of Door 204A at Vestibule Room, this needs to be repainted where it abuts the metal door <br /> frame. <br /> 15 . West wall of open Office area 202, the wall adjacent to Conference Room 203 , just to the left of Door 204 a <br /> lot of nicks in the drywall, carpet glue, etc . Needs to be cleaned, patched and repainted. <br /> 16. Column in the center area of open Office 202 needs to be repainted with a second coat of paint. <br /> Corridor 202 <br /> 1 . Open Office Area 202, item west wall ceiling tile along the wall approximately 2 ceiling tiles to the left of the <br /> hom strobe is chipped. <br /> 2 . Ceiling tile in front of the free standing column, the 3 full ceiling tiles there is a chip in the tile. <br /> 3 . Ceiling grid in front of 230B is damaged. <br /> 4. Ceiling tile in front of Copy/Coffee Area 212 in between that area and Door 210 approximately 4 ceiling tiles <br /> off that wall, tile is chipped. <br /> 5. Open area in front of Office 214 and mailroom 213, west wall data outlet to the left, left side of west wall <br /> needs being patched and repaired at this time. <br /> 6. Vinyl base has been installed in this area. <br /> 7 . Vinyl base to the left of Door 214A joints cut too short. Also, drywall to the left of Door 214A, drywall needs <br /> to be sanded and repainted on the bottom left and also electrical outlet box needs cover plate . <br /> Conference Room 203 <br /> 1 . Door 203A outside right edge of the metal door frame is dented, needs to be patched and repaired. That is <br /> also true of the bottom portions of the jamb, right and left side needs to be patched and repaired. <br /> 2. Lights are not operating in Conference Room 203 . <br /> 3 . No doors installed at this time. <br /> 4. No vinyl base installed in Room 203. <br /> 5 . 90% of the ceiling tile is not in place at this time. <br /> 6. Carpet joints where the Teal Carpet meets the Pattern Carpet, very irregular, needs to flattened out or cut in <br /> re-secure to the adhesive. <br /> 7 . Drop drywall soffit at the Conference Room area needs to be repainted at the Sprinkler Heads, fingerprints. <br /> 8 . Outside corners of the drop soffit are rough and irregular, these need to be sanded and repainted. That is also <br /> true of the inside comers . <br /> 9. East wall of Conference Room, electrical outlet to the left of Door 203A , drywall around that outlet needs to <br /> be sanded and repainted. That is typical of both outlets on this wall . <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.