My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-263E
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-263E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:56:50 AM
Creation date
9/30/2015 11:03:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
08/20/2007
Control Number
2007-263E
Agenda Item Number
County Administrator signature
Entity Name
Donadio & Associates
Subject
Punch List Bldg. 2 1st Floor West and Center Portion
Area
New County Administration Buiding #2
Supplemental fields
SmeadsoftID
6493
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Administration Complex <br /> Bldg. 2 - 1st Floor Punch List - Friday - 06/29/07 <br /> July 09, 2007 <br /> Page 2 <br /> Corridor 103 (continued) <br /> 10. Drywall wall between Door 301A and 303B above the vinyl base needs to be repainted and also to the left of <br /> the outside corner by Door 303B drywall needs to be repainted along with scratches and dents on the outside <br /> corner. <br /> 11 . Drywall to the left of hollow metal door frame 303B above the vinyl base needs to be repainted. That is also <br /> true at the top right and left comers on the right side of the hollow metal frame completely around Door 303B , <br /> the drywall needs to be repainted. <br /> 12. Vinyl base to the right of Door 303B is not setting flush to the wall, needs to be removed, sanded and re- <br /> installed. <br /> 13. Paint needs to be removed from the hinges of Door 303B . <br /> 14. Right outside corner of Door 303B above the vinyl base door is damaged. This needs to be repaired. <br /> 15 . Length of wall from Door 303B to Door 311A the wall needs to be cleaned of dirt, debris, drywall dust and <br /> touched up and repainted where necessary where the finish has been damaged. <br /> 16. Drywall around Door 311A needs to be completely repainted, door has just been recently installed, hollow <br /> metal frame 311A has not been painted. <br /> 17 . Floor tile has been chipped up to install the hollow metal door frame to the left of the Door 311A and to the <br /> right of hollow metal door frame 311 A . <br /> 18. Door 311A has no view lights installed. <br /> 19. Drywall needs to be repainted completely around the right and left sides and tops of Doors 31 IA. <br /> 20. Fire extinguisher cabinet still has painter tape around it. <br /> 21 . Exterior Door 103B - Ceramic tile needs to be grouted at the threshold and at the removable mullion . <br /> 22 . Exterior hollow metal Door 103B needs to be repainted inside and the jambs right and left sides . <br /> 23 . Access panel to the right of hollow metal door 103B needs to be painted, finish is chipped . It is white finish <br /> at this time. <br /> 24. Head of hollow metal frame where the removable mullion has been attached, needs to be sanded and <br /> repainted. <br /> 25 . Painters tape needs to be removed from fire alarm pull station, fire alarm horn strobe and electrical outlets in <br /> this area. <br /> 26. Ceiling tile is missing in 6 locations in this area in front of Door 103B . <br /> 27. Boxed out column to the right of Door 103B no ceiling grid installed around that boxed out area. <br /> 28. Drop ceiling in front of Doors 211A and 401A & B ceiling tile not in place . <br /> 29. Drywall ceiling in front of Door 311A needs to be touched-up with paint along the complete perimeter <br /> adjacent to the wall. Also, drywall opening at the sprinkler heads in front of Door 311A and in front of door <br /> 401A & B opening cut too large needs to be patched and repaired . <br /> 30. Light fixture, can lights need to set flush and level to the drywall . <br /> 31 . West end of drywall ceiling bottom edge is chipped, needs to be repainted. <br /> 32. Ceiling tile in the area from Alcove for 311A down to the end of Corridor 103 numerous ceiling tiles are out <br /> of place. <br /> 33 . Ceiling grid adjacent to west face of the dropped ceiling in front of Doors 311A needs to be cleaned of <br /> drywall mud, etc . Also, ceiling tile to the left needs to be refinished, this is chipped. <br /> 34. Drywall to the left of Door 401B needs to be repainted, spots in the drywall finish. <br /> 35 . Hollow metal door frame 401B needs to be repainted on the sides and at the head where the drywall abuts the <br /> head needs to be sanded, caulked and repainted. <br /> 36. Hollow metal frame 401 A needs to be repainted completely . <br /> 37 . Transition strips needed between the carpet and ceramic tile at Door 401A and 401 B . <br /> 38. Door 401A inside left edge finish is scratched. <br /> 39. Drywall to the right of hollow metal frame 401A needs to be repainted where the metal frame abuts the <br /> drywall . <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.