My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-263F
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-263F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:59:03 AM
Creation date
9/30/2015 11:03:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
08/20/2007
Control Number
2007-263F
Agenda Item Number
County Administrator signature
Entity Name
Donadio & Associates
Subject
Building 2 2nd floor interior punch list
Area
New County Administration Building 2
Supplemental fields
SmeadsoftID
6494
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Administration Complex <br /> Bldg. 2 - 2nd Floor Punch List - Friday - 05/25/07 <br /> June 5 , 2007 <br /> Page 10 <br /> Office 107 <br /> 1 . Door 107A hollow metal door frame needs to be repainted at the edges and carpet adhesive removed. <br /> 2 . Vinyl base to the left of Door frame 107A needs to be secured to the wall . <br /> 3 . Drywall behind 107A that is on the south wall, needs to be sanded and painted approximately 30" up off the <br /> floor. <br /> 4. Drywall above electrical outlet needs to be sanded and repainted. <br /> 5 . East wall the northeast corner drywall needs to be sanded and repainted in the comer and above the vinyl <br /> base. Also, the opposite corner which would be the northeast comer needs to be repainted where it has <br /> patched and repaired. <br /> 6. West wall to the right of the quad outlets data outlet that was installed, drywall has been sanded and patched, <br /> needs to be repainted and be consistent with the paint on the wall . Also, between the quad data outlet on this <br /> same wall and the duplex outlet about the middle approximately 2ft. off the floor gouge in the drywall needs <br /> to be patched and repaired. <br /> 7 . Drywall around the light switch needs to be sanded and repainted, drywall irregular. Also, above this same <br /> area to the right of the top right of Door 107 area needs to be repainted, irregular finish in the paint. <br /> Unfinished Area 601 <br /> 1 . Not ready to be punched out, being used as a Storage Area. <br /> Unfinished Area 602. <br /> 1 . Not ready to be punched out, being used as a Storage Area. <br /> First Floor Atrium <br /> 1 . Atrium area not ready to be punched out at this time. <br /> 2. Dura-plex finish coat being put on. Paint is being applied, etc . in this area. Need to be punched out at later <br /> date when the space is finished . <br /> First Floor Area Building 2 <br /> 1 . Not ready to be punched out yet. Too much drywall work, carpeting cabinetry, flooring going on . <br /> See General Notes on next page: <br /> D O N A D I O <br /> & Associates, Architects, P.A . <br />
The URL can be used to link to this page
Your browser does not support the video tag.