My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-263F
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-263F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2016 10:59:03 AM
Creation date
9/30/2015 11:03:24 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
08/20/2007
Control Number
2007-263F
Agenda Item Number
County Administrator signature
Entity Name
Donadio & Associates
Subject
Building 2 2nd floor interior punch list
Area
New County Administration Building 2
Supplemental fields
SmeadsoftID
6494
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Administration Complex <br /> Bldg. 2 - 2nd Floor Punch List - Friday - 05/25/07 <br /> June 5, 2007 <br /> Page 5 <br /> Conference Room 307 (continued) <br /> 8. To the right of Door 307B electrical outlet cover plate needs to be installed. <br /> 9. East wall borrowed light window 307, the hollow metal frame needs to be completely repainted . Also, this <br /> wall needs to be repainted, numerous patches, etc. <br /> 10. West wall vinyl base needs to be cleaned of dirt and debris. <br /> 11 . Quad outlet needs to have a cover plate installed in the west wall . <br /> 12. West wall to the right of the easternmost electrical outlet damage in the drywall needs to be patched and <br /> repaired. Also, gouges in the drywall above the vinyl base needs to be patched and repaired, repainted. <br /> 13 . Also, on this north wall to the west half there is a horizontal gouge above the vinyl base needs to be patched <br /> and repaired. <br /> 14. Ceiling grid installed. <br /> 15 . Ceiling tile installed around the perimeter. <br /> 16. No ceiling tile installed at the interior of the ceiling grid. <br /> 17. Perimeter accent carpet rile joints are very visible . Needs to be looked at. <br /> Corridor 105 <br /> 1 . Door 105A door frame needs to be protected due to the dura-plex finish going on the wall and not Atrium <br /> side. <br /> 2 . Bottom right inside face of Door 105, the door is damaged. Needs to be patched and repaired or replace. <br /> 3 . Metal window frame for the view light needs to be repainted on both sides. Paint is chipping. <br /> 4. Door needs to be cleaned of dirt, debris, drywall mud, etc . <br /> 5 . Ceiling grid installed. A couple of areas need to be finished up down towards Door 105 and 503A. <br /> 6. Numerous ceiling grid are missing out of line, hanging loose. That is typical along the complete Corridor <br /> 105A. <br /> 7 . Ceiling grid only installed at sprinkler heads and A/C Grilles. <br /> 8 . South wall to the left of the electrical outlet, drywall around the electrical outlet needs to be sanded and <br /> repainted, very irregular. Also, to the left of the electrical outlet approximately 217t., gouge in the drywall <br /> needs to be patched and repaired. Also, going to the east approximately Wt., a gouge in the drywall above <br /> the vinyl base. <br /> 9. Fire extinguisher cabinet to the right of Door 503A needs to be caulked where it abuts the drywall. Also, to <br /> the right of this area approximately 5Ft. , just above the vinyl base there is an irregularity in the drywall that <br /> needs to be sanded and repainted. <br /> 10. Door 503A does not close properly in the frame. Is not engaged in the strike. <br /> 11 . Outside corners to the left and right of Door 503A alcove needs to be sanded and repainted. Also, vinyl base <br /> in not adhering at the outside corners. <br /> 12. Drywall to the right of the Door 503A needs to be touched-up with paint and that is also true above the vinyl <br /> base. <br /> 13 . Carpeting in this area is not been protected . Dust, dirt has been tracked throughout. Repair. <br /> 14. Drywall wall running from Door 503A to the east needs to be repainted. Fingerprints, scuff marks, roller <br /> marks, finish not acceptable. <br /> 15. Door 105B Hollow metal frame has not been painted. <br /> 16. Doors need to be cleaned of drywall mud, dirt, debris, etc. <br /> 17. To the left of Door 105B just to the right of Data Outlets 07D & 08D needs to be cleaned of drywall mud. <br /> 18. North wall of Office 106 off of Corridor 105 carpeting adhesive needs to be cleaned off the wall in this area. <br /> 19. Vinyl base running from Door 106A to 107A is not set level to the floor towards Door 107 . Needs to be <br /> redone. <br /> 20. To the left of Door 107A drywall has carpet adhesive on it and also gouges in the drywall needs to be patched <br /> and repaired. <br /> 21 . To the bottom left of the fire alarm hom strobe to the left of Door 107A, pencil marks on the wall need to be <br /> repainted. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.