Laserfiche WebLink
Indian River County Administration Complex <br /> Bldg. 2 - 2nd Floor Punch List - Friday - 05/25/07 <br /> June 5, 2007 <br /> Page 8 <br /> Work Room 502 <br /> 1 . Door frame 502B needs to be painted at the outside edges and carpet glue removed. <br /> 2. Door needs to be cleaned of dirt, debris and paint, etc. <br /> 3 . Painters tape still installed on vinyl base in this area. <br /> 4. North wall, East end carpet glue needs to be cleaned just above the vinyl base. Also, along this same North <br /> wall, a couple of areas drywall mud on top of the vinyl base at the center between duplex outlet fixtures . <br /> 5 . Drywall wall to the right of Door 502A, a lot of patching and repairs, this hole needs to be patched and <br /> repainted. Painting needs to be consistent with overall color of the wall and that is also true to the left of Door <br /> 502A. <br /> 6. Door frame 502A needs to have carpet glue removed on the inside and outside face and touched-up with paint <br /> on the outside edges. <br /> 7 . Ceiling tile installed in this room. <br /> 8. Vinyl base installed and carpeting. <br /> 9. Ceiling tile in front of Door 502A, not setting flush to the grid and also just in front of that door <br /> approximately three ceiling tiles along the wall to the left of Door 502A adhesive on the tile and the grid. <br /> 10. Ceiling grid to the right of Door 502A, 4" ceiling tiles off the right side of Door 502A, one grid off the wall <br /> where Door 502A is located, grid is damaged and also a joint in the middle of the grid is uneven, bent. <br /> Conference Room 504 <br /> 1 . Door 504A, door frame needs to be sanded and repainted at the edges and also where there is carpet adhesive <br /> installed. <br /> 2. Ceiling gird installed in only perimeter acoustical tile installed. <br /> 3 . Exterior wall needs to be repainted completely, patching and repair at the window sills. This needs to be <br /> redone before it can be inspected. <br /> 4. to the left of Door 504A and below the wall stop drywall needs to be repainted and also to the top left the grid <br /> on the wall . <br /> 5 . West wall going to the South patch and repairs above the vinyl base need to be repainted and also around the <br /> new duplex outlet that has been added on this area has been painted but it is inconsistent with overall finish of <br /> the wall. <br /> 6. Ease wall towards the exterior wall data outlet added, that is data outlet 52D drywall has been patched, needs <br /> to be sanded and repainted and vinyl base needs to be cleaned in this area. <br /> 7. Vinyl blinds have not been installed at this time. <br /> 8. Door 504 does not close properly, hits the metal frame on the strike side. <br /> 9. To the left of Door 504B, just above the vinyl base approximately 4ft. irregularity in the drywall needs to be <br /> sanded and repainted. Also, about the center of the wall above the vinyl base same irregularity needs to be <br /> sanded and repainted. <br /> Office 505 <br /> 1 . Door 505A — Hollow metal door frame needs to be cleaned of carpet adhesive and edges need to be <br /> repainted. <br /> 2. Bottom edge of door hinge side needs to be cleaned of carpet glue. <br /> 3 . Furniture stored in the middle of this room. Also, half of the vinyl base is covered with painters tape. <br /> 4. Duplex outlet on the West wall needs cover plate installed. <br /> 5 . No blinds installed at the windows. <br /> 6. Jambs and window left and right side need to be repainted where it has been touched-up. Paint color is <br /> inconsistent around the perimeter of the window and at the jambs. <br /> 7 . Top exterior left inside corner needs to sanded and repainted, drywall is irregular. <br /> 8. East wall above the vinyl base in the middle of the wall pin holes in the drywall, gouges, needs to be sanded <br /> and repainted. <br /> D O N A D I O <br /> & Associates, Architects, P.A. <br />