Laserfiche WebLink
DESCRIPTION OF PROJECT OR USE OF SECONDARY ROAD FUNDS POR 1964-65 <br />1. Installation of automatic signal gates at FEC railroad crossing <br />and the now completed project, Roseland Road, S-505. <br />2. West Wabasso Road, State Road 510, from State Road 5, West to <br />a point on the South line of Section 26, Township 31 South, Range <br />38 East, which was the beginning of job 8855-150, with crossing <br />signals at the railroad tracks, approximately 4.0 miles. <br />3. Kings Highway, State Road 505-A, from North Relief Canal to <br />North Winter Beach Road and from Hobart Road to Wabasso Road, <br />State Road 510, approximately 2.8 miles. <br />4. To complete survey and alignment map for Indian River Boulevard <br />from Township line dividing 31 South, and 32 South, to Oslo Road, <br />approximately 10.0 miles. <br />5. Ranch Road, (82nd Avenue) from SR 60 to Oslo Road SR 606 and Oslo <br />Road from Rangeline to Ranch Road, approximately 4.5 miles. <br />6. Widening and reconstruction of the Old Dixie Highway from 19th <br />Street to SR 612, Glendale Road, and the paving of 14th Avenue <br />from 16th Street to the Old Dixie Highway, approximately 1.75 <br />miles. <br />7. 16th Street, from Clemanns Avenue SR 611 to Kings Highway, SR <br />505-A, approximately 1 mile. <br />8. Glendale Road, State Road 612, from Kings Highway SR 505-A to <br />Ditch D-4 (or 90th Avenue), approximately 4 miles. <br />9. Clemanns Avenue, State Road 611 from State Road 60 to Walker <br />Avenue including bridge over Main canal, approximately 0.5 mile. <br />