U-4-- a6 <br />til A, <br />� <br />='W�AIA Document G701TM- 2001 <br />Change Order <br />PROJECT (Name and address): CHANGE ORDER NUMBER: 006 <br />New County Administration Building DATE: April 4, 2006 <br />Lying Adjacent to 27th Street, Vero <br />Beach, F1 <br />TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 2102 <br />Turner Construction Company CONTRACT DATE: (Amendment #2) August 23, 2005 <br />800 N. Magnolia Avenue - CONTRACT FOR: Guaranteed Maximum Price - <br />Orlando, Florida 32803 Construction Management at Risk <br />OWNER: EJ <br />ARCHITECT: <br />CONTRACTOR: ®✓ <br />FIELD: ❑ <br />OTHER: ❑ <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Include, inhere applicable, an}' undisputed amount attributable to previously cvecured Constuction Change Directives) <br />Reference Description <br />Amount <br />COR -030 Provide an extension of time (5 calendar days) to the contract for substantial completion <br />Completion Date due to delays (10/21/05 to 10/26/05) resulting from Hurricane Wilma. the <br />new Substantial Completion date is January 21, 2007 <br />$0 <br />COR -031 Provide additional electrical service distribution conduit for Buildings I and 2 as well as the <br />Health Department building and data conduit/raceway for data distribution, as required by <br />revisions indicated on Drawing 0-E1.0P. Includes revised irrigation pump feed to location <br />indicated on Irrigation Drawings and includes partial rework of installed 4" underground data <br />conduit in Building 2. <br />$75,821 <br />COR -033 Provide additional LT type decorative light fixtures for both Buildings I and 2 that were not <br />included in the GMP. this item sis for material only. The labor is added as a result of this work <br />is to be funded from Turner's Construction Contingency within the GMP. <br />$67,664 <br />The payment of these Change Items will not change the GMP but will decrease the Owner's Contingency by <br />$143,485 <br />The original Guaranteed Maximum Price was $ <br />33,086,442 <br />The net change by previously authorized Change Orders $ <br />(3,844,244) <br />The Guaranteed Maximum Price prior to this Change Order was $ <br />29,242,198 <br />The Guaranteed Maximum Price will be decreased by this Change Order in the amount of $ <br />(0) <br />The new Guaranteed Maximum Price including this Change Order will be $ <br />29,242,198 <br />The Contract Time will be increased by Five ( 5 ) days. <br />The dam of Substantial Completion as of the date of this Change Order therefore is January 21, 2007 <br />NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price <br />which <br />have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br />Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BYTHE ARCHITECT, CONTRACTORAND OWNER <br />ARCHITECT: CONTRACTOR: OWNER: <br />Donadio & Associates, Architects, P.A. Turner Construction Company Indian River Count Board of Count <br />609 17th Street 800 N. Magnolia Avenue Commissioners Y Y <br />Vero Beach, Florida 32960 Orlando, Florida 32803 1840 25th Street <br />/� Vero Beach, Florida <br />A onadi tLouisr <br />tsepthCounty Administrator <br />Date at <br />AIA Document G7ZIrd - 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WA <br />AIA Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA <br />any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum exten Is under the <br />document was produced by AIA software at 16:21:40 on 03/28/2006 under Order No. 1000192296_1 which expires f /8/2006, Intl is not for <br />User Notes: <br />and Reco ndef for Approval: <br />�-c__, 44F/b6 �, , ,J u). <br />This <br />nv <br />