Laserfiche WebLink
rented from the Construction Manager or others, and costs of transportation, installation, tr nor <br /> repairs and replacements, dismantling and removal thereof. Rates and quantities of equipment rented <br /> shall be subject to the Owner' s prior written approval. <br /> .3 Costs of removal of debris from the site. <br /> ;4 Reproduction costs, costs of telegrams, facsimile transmissions and long-distance telephone calls, <br /> postage and express delivery charges, telephone at the site and necessary and reasonable peay cash <br /> expenses of the site office. <br /> .5 That portion of the necessary and reasonable travel and subsistence expenses of the Constr ction <br /> Manager's personnel incurred while traveling in discharge of duties connected with the .Work <br /> limited as set forth in Florida Statutes section 112.061 and further provided that no milea2C shall be <br /> charged for travel within Indian River County. <br /> § 6,1 .6 MISCELLANEOUS COSTS <br /> .1 That portion directly attributable to this Contract of premiums for insurance and bondspro ided " <br /> however, that foregoing costs shall not be included in calculation of the Cost of the Work for the <br /> purpose of the amount of the bonds. <br /> Qf charges for self- insurance are to be included, specify the basis of reimbursement. ) <br /> .2 Sales, use or similar taxes imposed by a governmental authority which are related to the W rk and for <br /> which the Construction Manager is liable.liable subject to the Owner' s use of Direct Purch se <br /> Procedures set:forth in the Contract Documents. <br /> .3 Pees and assessments for the building permit and €o"ther permits, licenses and inspections for which <br /> the Construction Manager is required by the Contract Documents to pay. <br /> .4 Fees of testing laboratories for tests required by the Contract Documents, except those related to <br /> nonconformingWork ether- thaa that for- whieh payfaent is pefffitted by Seetien 6 . 1 . 8 .2 . <br /> Royalties and license fees paid for the use of a particular design, process or pr uct <br /> required by the Contract Documents; the necessary and reasonable cost of defending suits or claims <br /> for infringement of patent or other intellectual property rights arising from such requirement by the <br /> Contract Documents ; payments made in accordance with legal judgments against the Construction <br /> Manager resulting from such suits or claims and payments of settlements made with the Owner' s <br /> written rconsent; provided, however, that such costs of legal defenses, judgment and settle m nts shall <br /> not be included in the calculation of the Construction Manager' s Fee or the Guaranteed Maximum <br /> Price and provided that such royalties, fees and costs are not excluded by the last sentence of Section <br /> 3 . 17. 1 of A1281TM'— ' rA201TM- 1997, as modified, or other provisions of the Contract Documents. <br /> .6 Data processing costs directly related to the Work. <br /> .7 Deposits lost for causes other than the Construction Manager' s negligence or failure to fulfi I a <br /> specific 'responsibility to the Owner set forth in this Agreement. <br /> .8 ,Legal and mediation and at bitmtiefrcosts, other than those arising from disputes between the <br /> _ Owner and Construction Manager, reasonably incurred by the Construction Manager in the <br /> performance of the Work and with the Owner' srp for written permission, which permission shall not <br /> be unreasonably withheld. <br /> 9 Expenses incurred in accordance with Construction Manager' s standard personnel policy for actual <br /> relocation and temporary living allowances of personnel required for the Work, in case it is necessary <br /> to relocate such personnel from distant locations. locations if approved in writing by the Owner in <br /> advance. <br /> § 6.1 .7 OTHER COSTS <br /> A Other costs incurred in the performance of the Work if and to the extent approved in advance in <br /> writing by the Owner. <br /> § 6.1 .8 EMERGENCIES AND REPAIRS TO DAMAGED OR NONCONFORMING WORK <br /> The Cost of the Work shall also include costs described in Section 6 . 1 . 1which are incurred by the Construction <br /> Manager: <br /> .1 In taking action to prevent threatened damage, injury or loss in case of an emergency affecting the <br /> safety of persons and property, as provided in Section 10 .6 of A20 1 I 19°TA20ITM– 1997 as <br /> modified . <br /> .2 <br /> OEthe Constfuction Manager-' s Subeentraeters of- suppliers, pr-evided that such damaged of <br /> AIA Document A121 TmCMc — 2003 and AGC Document sss. Copyright ® 1991 and 2003 by The American Institute of Architects and Fhe Associated <br /> General Contractors of America. All rights reserved. WARNING: This document is protected by U.S. Copyright Law and Internatlo rial Treaties. 14 <br /> unauthorized reproduction or distribution of this document, or any portion of 1% may result In severe civil and criminal penalties and will be <br /> prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 12:50: 12 on 04/19/2005 under Order <br /> No. 1 0001 26313_1 which expires on 6/29/2005, and is not for resale. <br /> (1413727908) <br /> User Notes: <br /> �l <br />