Laserfiche WebLink
Project. MC Coastal Mechanical Services CMS COR# -6 <br />GC: Turner Change Order Proposal 3/22/2006 <br />1. Material Cost Total $747 <br />Tax 7.0% <br />TOTAL MATERIAL -$800 <br />2. Labor Cost Total -257.0 Labor Hm <br />0.0 Foreman Hrs <br />Base Rate $35.00 -$81994 <br />Foreman Rate $42.50 $0 <br />Labor Rate 55% -$4,947 <br />TOTAL LABOR 48,994 <br />3. Other Direct Costs -$474 <br />4. Subcontractors Total <br />5. Direct Cost Total <br />7. OH 8: P Direct Costs <br />8. Bonds and Insurance <br />TOTAL PRICE OF CHANGE PROPOSAL <br />8. Extension to Contract Duration <br />M513 COR MAs <br />15% ($2,1 <br />1% ($1 <br />0.0 Days <br />