My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-137D
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-137D
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 11:32:43 AM
Creation date
9/30/2015 10:45:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/17/2007
Control Number
2007-137D
Agenda Item Number
11.C.1
Entity Name
Turner Construction
Subject
Change Order No. COR-096
Area
County Administration Building 1801 27th St.
Project Number
11531
Supplemental fields
SmeadsoftID
6269
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Tu 118 <br /> SCENE 045 <br /> Buiidho the Future <br /> IRC New Admin Building B 14 0 6 Transmittal <br /> project # 11531 <br /> 2625 11 Avenue ACOUSTI - ROCYL[993Wheet, Detailed, Grouped by Each Transmittal Number] <br /> Vero Beach , FL 32960 Telephone: 772.564.8141 Fax: 772 .564.8143 August 07, 2006 <br /> Date: r0 . <br /> Transmittal No: • : <br /> Doug Capps Karen Berg <br /> Acousti Engineering Company of Florida Turner Construction Company <br /> 426 Gus Hipp Blvd. 2625 19th Avenue <br /> Rockledge, FL 32955 Vero Beach , FL 32960 <br /> Tel: 321 -636-4042 Tel: 772-564-8141 <br /> Fax: 321 -636-4087 Fax: 772-564-8143 <br /> Q Acknowledgement Required <br /> Information Federal Express <br /> In WIN I III I 1 11 <br /> 1111111011 111 1 111 IM , III 1 ! ,Iiil ; ! <br /> 001 1 Drawings and Sheet: 1 -A1 .1 Building 1-First Floor Overall For Construction <br /> Specifications Revision 9 Dated:Floor Plan <br /> 7/12/2006 <br /> 002 1 Drawings and Sheet: 1A1 .1 . 1 Building 1-First Floor Partial ' 2, 0 Lf L For Construction <br /> Specifications Revision 9 Dated:Floor Plan 0 <br /> 7/12/2006 <br /> 003 1 Drawings and Sheet: 1-A7 .2 Building 1-Second Floor 2 For Construction <br /> Specifications Revision 9 Dated:Overall Floor Plan <br /> 7/12/2006 <br /> 004 1 Drawings and Sheet: 1 -At2. 1 Building 1-Second Floor - S For Construction <br /> Specifications Revision 9 Dated:Partial Floor Plan <br /> 7/12/2006 <br /> 005 1 Drawings and Sheet: 1-A1 .2.2 Building 1-Second Floor For Construction <br /> Specifications Revision 9 Dated:Partiat Floor Plan De �� <br /> 7/12/2006 . - <br /> om 1 Drawings and Sheet' 2 A1: 1 .2 Building 2-First Floor Partial - 2A p 3 For Construction 5 j{J 3- <br /> Specifications <br /> Specifications Revision 9 Dated:Floor Plan Ike. <br /> 7J12/2006 - _ - a n It $ 1 C <br /> 007 1 Drawings and Sheet: 1-A3. 1 Building 1 -First Floor Overall For Construction <br /> Specifications Revision 9 Dated:Refected Ceiling Plan <br /> 7/12/2006 <br /> 008 1 Drawings and Sheet 1-A3.1 .1 Building 1 -First Floor Partial G� For Construction <br /> Specifications Revision 9 Dated:Refelected Ceiling Play 45j <br /> 7/12/2006 - JLlI, <br /> 009 1 Drawings and Sheet: 1-A8.0.1 Building 1 -Door Schedules For Construction <br /> Specifications Revision 9 Dated: <br /> 7/12/2006 <br /> 010 1 Drawings and Sheet: 1 A9.0. 1 Building 1 Material Finish For Construction <br /> Specifications Revision 9 Dated:Schedules <br /> 7/12/2006 - <br /> 011 1 Drawings and Sheet: 1 -1D1 . 1 .1 Building 1 -First Floor Partial For Construction <br /> Spermcations Revision 9 Dated: Interior Finishes Plan <br /> 7/14/2006 <br /> 012 1 Drawings and Sheet: 1 -1 D1 . 1 .2 Building 1-First Floor Partial For Construction <br /> TCCO - Transmittal Cover Sheet.rptrQ '(4 ` � `2' ` j <br /> RPT Revised: 3l10f2006 v '9fjf (/I Page t of <br />
The URL can be used to link to this page
Your browser does not support the video tag.