My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-257
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-257
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2016 4:33:36 PM
Creation date
9/30/2015 9:52:53 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
07/18/2006
Control Number
2006-257
Agenda Item Number
7.M.
Entity Name
Turner Construction Company
Subject
Change Order No.13 and 14 - Fire Alarm
Area
new county administration building
Supplemental fields
SmeadsoftID
5745
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORIGINAL <br /> IMv <br /> Document G701TM - 2001 <br /> 9 . <br /> A006 - as7 <br /> Change Order <br /> PROJECT (Name and address): CHANGE ORDER NUMBER: 014 OWNER: <br /> New County Administration Building DATE: July 18, 2006 ARCHITECT: <br /> Lying Between the Main Relief Canal to <br /> the North, the Lateral D Canal on the CONTRACTOR: <br /> Sounth and East and 20th Avenue to the <br /> West FIELD: ❑ <br /> TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 2102 OTHER: ❑ <br /> Turner Construction Company CONTRACT DATE: (Amendment # 2) August 23, 2005 <br /> 800 N. Magnolia Avenue CONTRACT FOR: Guaranteed Maximum Price - <br /> Orlando, Florida 32803 Construction Manager at Risk <br /> THE CONTRACT IS CHANGED AS FOLLOWS: <br /> (Include, rnhere applicable, any undisputed amount attributable to previously executed Construction Change Dit-ectives) <br /> Reference Description Amount <br /> COR #052 Provide directional bore conduits for fiber optics under new culvert bridge at <br /> IRFWCD Lateral E Canal (Six 4" conduits) in lieu of direct burial over new culvert bridge. $ 12,316 <br /> COR #056 Provide 3/4" asphalt overlay on existing parking lot area east of existing Health Department $9,292 <br /> Total $21 ,608 <br /> The payment of these change items will not change the GMP, but will decrease the Owner's Contingency by $21 ,608 <br /> The original Guaranteed Maximum Price was $ 33.086,442.00 <br /> The net change by previously authorized Change Orders $ (5,360,738.00) <br /> The Guaranteed Maximum Price prior to this Change Order was $ 27,725.704.00 <br /> The Guaranteed Maximum Price will be increased/decreased by this Change Order in the amount of $ 0.00) <br /> The new Guaranteed Maximum Price including this Change Order will be $ 27,725,704.00 <br /> The Contract Time will be increased by Zero ( 0 ) days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is January 21 , 2007. <br /> NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which <br /> have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br /> Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br /> NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br /> Donadio & Associates, Architects, P.A. Turner Construction Company Indian River County Board of County <br /> Commissioners <br /> ARCHITECT (Firm name) CONTRACTOR (Firm name) OWNER (Firm name) <br /> 609 17th Street, Vero Beach, Florida 184025th Street, Vero Beach,Florida <br /> 32960 32960 <br /> AD ES ADDRESS ADDRESS <br /> , <br /> BY Sign e) BY (Signanu (Signan re) <br /> Anthony Donadio Louis Fiore oseph A. Baird, County Administrator <br /> (7yped name)� (Typed name) (Typed name) <br /> W7 /ii /0 (, <br /> -DATT DATE DATE <br /> AIA Document G701 TM - 2001 . Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. ARNING: This AIA® <br /> Document Is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIAs D cu t, or any <br /> portion of It, may result In severe civil and criminal penalties, and will be prosecuted to the maximum ex ssible under the s document <br /> was produced by AIA software at 10:31 :54 on 07/11 /2006 under Order No. 1000192296_1 which expires on a/ 2006, a is not for re <br /> User Notes: ( 1392) <br /> Revie Recommended for Approval <br /> K/ <br /> Steve Blum, Project Manager Thomas W. Frame, eral Services Director las n Brown. Budget Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.