Laserfiche WebLink
Turner <br /> November 18, 2006 <br /> December 28, 2006 , Rev. <br /> Mr. Steve Blum <br /> Project Manager <br /> Indian River County Administration Complex <br /> 2625 19th Avenue <br /> Vero Beach , FL 32960 <br /> RE: IRC New Admin Building <br /> 2625 19th Avenue <br /> Vero Beach , Florida 32960 <br /> Project #: 11531 <br /> Change Order Request Number COR 076 <br /> Scope Change <br /> Dear Mr. Blum, <br /> We have finalized gathering all the required quotations for PCO 038 for the following extra work: Allowance <br /> Adjustment for Completion of Cafe MEP, including added Sink in Lounge 2. 1 -226 and Light Fixture Revisions <br /> in Building 1 --Floor 1 West, Floor 1 East, and Floor 2 Atrium per Drawings issued as CCD's 012 & 016. We <br /> have reviewed the Subcontractor Proposals (copies attached hereto) and have verified that all extra work items are <br /> in compliance with our Contract Agreement. The following is a detailed itemization of all extra costs: <br /> PCO No Item No Description Amount Contractor <br /> 038 001 Release Allowance Hold for Cafe Rough-in ($35 , 000. ) COAMEC <br /> included in Contract. <br /> 038 002 Provide additional Plumbing for Cafe/Kitchen Area $ 13 ,341 . COAMEC <br /> as required by Drawings issued with CCD 014. <br /> Price includes one double and one single <br /> stainless steel sinks and excludes floor sinks <br /> shown . (Ref Coastal COR 21 ) <br /> 038 003 Add sink and related plumbing in Lounge 2. 1 -226 $3 ,492. COAMEC <br /> per RFI 025. (Coastal COR 4) <br /> 038 004 For additional Electrical Work in the Cafe and $ 10 ,302. MILELE <br /> Second Floor Atrium Lighting in Building 1 only, <br /> as shown on Drawings issued with CCD's 010 <br /> and Preliminary Issue of 016. (Miller COR's 37 & <br /> 63) <br /> 038 005 For additional Electrical Work required to provide $850. Turner Estimate <br /> power to Water Heater added in Cafe in CCD <br /> 014. <br /> 038 006 Provide additional Electrical Work associated with $4,438. MILELE <br /> Light Fixture Revisions in Building 1 , First Floor <br /> West as required by Drawings issued with <br /> Preliminary CCD 016 (Drawing 1 -E2 . 1 . 1 ). (Ref <br /> Miller COR 61 ) <br /> 038 007 Provide additional Electrical Work associated with $3,302 . MILELE <br /> Light Fixture Revisions in Building 1 , First Floor <br /> East as required by Drawings issued with CCD <br /> 010 and Preliminary CCD 016 (Drawing 1 -E2 . 1 .2 ). <br /> (Ref Miller COR 621 ) <br /> 038 008 Release Construction Contingency-Cafe Water ($725. ) TURCON <br /> Heater <br /> Total Change to the GMP: $0.00 <br />