Laserfiche WebLink
December 28, 2006 <br />Mr. Steve Blum <br />Project Manager <br />Indian River County Administration Complex <br />2625 19th Avenue <br />Vero Beach, FL 32960 <br />RE: <br />Dear Mr. Blum, <br />IRC New Admin Building <br />2625 19th Avenue <br />Vero Beach, Florida 32960 <br />Project #: 11531 <br />Change Order Request Number COR 065.1 <br />Scope Change <br />We have finalized gathering all the required quotations for PCO 079 for the following extra work; Time Extension for <br />CCD's 10,11,12,14,15,18, & 19. and Final Security Design Drawings. We have have verified that all items are in <br />compliance with our Contract Agreement. The following is a detailed itemization of all potential additional costs: <br />PCO No Item No Description Amount Contractor <br />079 001 Extend Substantial Completion Date 60 days from 1/31/07 to 4/1/07 as $240,000. TURCON <br />a result of Design Changes issued along with the following Construction <br />Change Directives: <br />CCD 010 Electrical Changes <br />CCD011 Site Sanitary Changes <br />CCD 012 Miscellaneous Office Revisions <br />CCD 014 Cafe Revisions <br />CCD 015 Water Meter Service Size <br />CCD 018 Millwork Revisions to Work Room and Mail Room <br />CCD 019 Millwork Addition for Conference Rooms <br />Final Security Design Revisions. <br />Estimate for potential additional General Conditions equals 30 days at <br />$4,000. per day. This COR is for time and related GC's only and does <br />not include Subcontractor and Vendor Costs. <br />079 002 Release Contingency -Extension of Time for CCD's 10, 11, 12, 14, 15, ($240,000.) INDR1V <br />18,19, and Security Revisions. <br />Total Change to the GMP: $0.00 <br />This change is for Extension of Time and related potential General Conditions Costs. Subcontractor and Vendor <br />Costs are included in other COR's that are submitted separately. This COR supersedes and cancels COR 065- <br />