Laserfiche WebLink
jou ? - <br /> r <br /> AIA Document G704TM - 2000 <br /> Certificate of Substantial Completion <br /> PROJECT: PROJECT NUMBER: 2102. 18/ OWNER: <br /> (Name and address): CONTRACT FOR: General Construction ARCHITECT: ❑ <br /> Indian River County CONTRACT DATE: August 04, 2004 <br /> Administration Building 1 CONTRACTOR: ❑ <br /> 1801 27th Street FIELD: ❑ <br /> Vero Beach, Florida 32960 <br /> TO OWNER: TO CONTRACTOR: OTHER: ❑ <br /> (Name and address): (Name and address): <br /> Indian River County Turner Construction, Co. <br /> 1801 27a Street 800 N. Magnolia Avenue, Suite 500 <br /> Vero Beach, Florida 32960 Orlando, Florida 32803 <br /> PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: <br /> Complete Building 1 as permitted and Site Plan approved. <br /> The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge, information and belief, <br /> to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated <br /> portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for <br /> its intended use. The date of Substantial Completion of the Project or portion designated above is the date of issuance established <br /> by this Certificate, which is also the daze of commencement of applicable warranties required by the Contract Documents, except <br /> as stated below: <br /> Warranty Date of Commencement <br /> Complete Building #1 . 0727/07 <br /> Donadio and Associates 07/27/07 <br /> Architects, P.A. 77 <br /> ARCHITECT DATE OF ISSUANCE <br /> A list of items to be completed or corrected is attached hereto. The failure to include any items on such list does not alter the <br /> responsibility of the Contractor to complete all Work in accordance with the Contract Documents. Unless otherwise agreed to in <br /> writing, the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate <br /> of Payment or the daze of final payment. <br /> Cost estimate of Work that is incomplete or defective: $50,000.00 <br /> The Contractor will complete or correct the Work on the items attached hereto within Thirty ( 30 ) days from the above ¢ U z <br /> date of Substantial Completion. O <br /> �J u- <br /> w y o <br /> Tumer Construction, Co. 00 0 <br /> / v w ¢ <br /> CONTRACTORBY DATE �' � �v LL F <br /> m wz <br /> Q V) <br /> The Owner accepts the Work or designated portion as su stantially complete and will assume full possession at S :OOA.M. (time) Z C <br /> on 0728/07 (date). r w <br /> Indian River County \_ (//©7���J� • � ���� V <br /> OWNER DATE �— a.v:� , t•. <br /> a - ' <br /> The responsibilities of the Owner and tractor for security, maintenance, heat, utilities, damage to the Work and insurance <br /> shall be as follows: <br /> (Note Owner 's and Contractor's legal and insurance counsel should determine and review insurance requirements and <br /> coverage. ) <br /> Owner is responsible for Security, Maintenance, Heat, Utilities, Damage to Work & Insurance for Building 1 . <br /> All Document G7041v - 2000. Copyright 01963, 1978, 1992 and 2000 by The American Institute of Architects. All rights reserved. WARNING: This Ale <br /> Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA° Document, or any <br /> portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document <br /> was produced by AIA software at 11 :07:23 on 08/06/2007 under Order No. 1000314206_1 which expires on 7/31/2008, and is not for resale. <br /> User Notes: /� (2062688438) <br />