My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-137A
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-137A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 11:13:00 AM
Creation date
9/30/2015 10:44:46 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
04/17/2007
Control Number
2007-137A
Agenda Item Number
11.C.1
Entity Name
Turner Construction
Subject
Change Order COR-091 County Administration Building
Area
1801 27th Street Administration Building
Supplemental fields
SmeadsoftID
6266
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0110 / 2K7 TUE 17 , 25 FAX 5611 68881 ; 8 Qt':.T :44 C2513 TURNER IN4 % 011 <br /> Am/dw- Awc 0assIZ1M&CAW71Ca/5a/i>iaasPraposa! CUSCuRf4f <br /> GC- tamer - 1615 CMA?r Z124MO7 <br /> Direct Costs Hours Labor Total <br /> Rates <br /> Projee! Manager 8 $75.00 $300.00 <br /> Project En ;neer $44.10 <br /> Sh $0.00 <br /> Drawings/As-Sullts/Subminals _ p $58.05 $0.00$112.10 <br /> Project Administrator - _ 1 $28.00 S28.00 <br /> 0w <br /> $740.10 <br /> ubeontractors quote <br /> Amount <br /> emperature Ccntrol $1 ,415.00 <br /> Insulation $587.00 <br /> lndaar Kir Quality <br /> COmmISalpnlOC <br /> ElecVical m <br /> est and Balance00 <br /> Core Drilling / Saw Cutting QtY Rate <br /> 3 Holes $55 $165.00 <br /> Nondestructive ?eating <br /> Other — <br /> subcontractorTotal (Line4) 52,532.00 <br /> r_ce atc�..� �>n eaowsedi uhmeu t.�: <br />
The URL can be used to link to this page
Your browser does not support the video tag.